Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 <br /> lib <br /> All twelve signalized intersections analyzed operate acceptable overall LOS during peak hours,and conditions are <br /> generally similar overall between both peak hours.US 70 generally experiences a better LOS than the cross streets at each <br /> intersection.Most side streets operate at an acceptable LOS during both peak hours except for a few intersections between <br /> Durham and Hillsborough.Mt.Herman Church Road and Pleasant Green Road operate at LOS F during both peak hours. <br /> At Lawrence Road,the northbound approach operates at LOS E during the AM peak,and the southbound approach <br /> operates at LOSE E during the PM peak hour. AW <br /> Between the Mt.Herman Church Road/Pleasant Green Road and Lawrence Road intersections is the unsignalized US 70 <br /> Bus/Palmers Grove Road intersection.The NB US 70 Bus approach operates at LOS F during both peak hours(with worse <br /> delay in the PM), and the SB Palmers Grove Road approach operates at the LOS D during the AM peak hour and LOS E <br /> during the PM peak hour.These LOS deficiencies are due mainly to vehicles waiting to turn onto US 70,although <br /> crossing and right-turning vehicles contribute. Combined with heavy peak-hour traffic,high speeds and some visibility <br /> constraints create long delays as drivers wait for adequate gaps in traffic. <br /> Due to their proximity to at-grade rail crossings,several signals in Mebane(Moore Street,3rd Street,4th Street,and 5th <br /> Street)require interconnection with the rail crossing signals and crossing gates to preempt normal traffic signal operation <br /> in the presence of a train.This preemption prevents conflicting signal combinations between the relevant traffic control <br /> devices. LOS is not calculated for preemptive operation,but such conditions obviously add delay and can create long <br /> vehicle queues. <br /> �h <br /> 4nhnhnhnhns <br /> `•h+h+' <br /> t, <br /> t u' <br /> u <br /> t, u � <br /> AH i <br /> � f <br /> ut " <br /> {5 <br /> Ji i <br /> 8 <br /> 62 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.