Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60 <br /> firâ–ºPo <br /> vo <br /> ilb <br /> Table 7: Corridor Level of Service Summary for US 70 Using Two-Lane Highways Analysis <br /> Segment AM Peak PM Peak <br /> Segment Segment Location Length <br /> p <br /> Segment ATS(mph) PTSF Segment ATS(mph) PTSF <br /> (miLOS N LOS N <br /> A Supper Club Rd to Mace Rd(EB/WB) 1.7 C/B 43.6/44.4 62.4/48.7 B/C 44.6/43.4 46.6/64.1 <br /> B Buckhorn Rd to Efland-Cedar Grove Rd(EB/WB) 3.9 B/A 49.3/50.4 47.9/31.8 AIB 50.2/49.5 34.7/46.0 <br /> C East of US 70 Connector to Hillsborough Border(EB/WB) 1.4 DIB 45.6/48.4 67.7/44.6 C/D 47.4/46.2 56.1 /65.1 <br /> E US 70 Bus to Pleasant Green Rd(EB/WB) 2.2 B/E 50.5/47.4 46.3/72.4 DIB 47.6/50.4 69.7/46.2 <br /> Suburban/urban roadways with more frequent traffic signals require arterial analysis to account for intersection-related <br /> delays. An arterial LOS analysis in Synchro using HCM 2000 methodology was completed for sections in Mebane and <br /> Hillsborough due to the number and spacing of signalized intersections through both municipalities and their transition <br /> areas.2019 Free Flow Speeds from StreetLight were utilized, and Table 8 shows the LOS criteria based on travel speeds. <br /> The average speed and corresponding LOS for both sections are shown in Table 9. <br /> Table 8: Level of Service Description for Urban Streets (HCM2000) <br /> Urban Free-Flow Travel Speed Threshold lower limit by Level of Service, mi/h <br /> Street Class Speed, mi/h A B C D E <br /> 55 >42 >34 >27 >21 >16 <br /> 1 50 42 34 27 21 16 <br /> 45 42 34 27 21 16 <br /> 45 35 28 22 17 13 <br /> 11 40 35 28 22 17 13 <br /> 35 35 28 22 17 13 <br /> 111 35 30 24 18 14 10 <br /> 30 30 24 18 14 10 <br /> 35 25 19 13 9 7 <br /> IV 30 25 19 13 9 7 <br /> 25 25 19 13 9 7 <br /> 58 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.