Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
59 <br /> lib <br /> Table 6 describes LOS criteria relating to average travel speed(ATS) and percent time-spent following(PTSF)for Class I <br /> facilities.PTSF can have a significant impact on LOS when there are few opportunities to pass slower-moving vehicles, <br /> typically because of sight-distance limitations. <br /> Table 6: Level of Service Description for Two-Lane Highways <br /> Level of Class I Highways <br /> Service ATS (mph) PTSF(%) <br /> A >55 <=35% <br /> B >50-55 35%-50% <br /> C >45-50 50%-65% <br /> D >40-45 65%-80% <br /> E <=40 >80% <br /> F Flow rate exceeds Flow rate exceeds <br /> segment capacity segment capacity <br /> Table 7 summarizes the results of HCS capacity analysis by segment and direction for the AM and PM peak periods.In <br /> general,LOS is slightly lower in the AM peak due to a combination of higher volumes and more pronounced <br /> directionality. <br /> The sections in Segments A,B,C, and D operate at an acceptable LOS in both directions during both peak hours.The <br /> section from US 70 Business to Pleasant Green Road in Segment E operates at an acceptable LOS in both directions during <br /> the PM peak hour and in the eastbound direction during the AM peak hour.This section operates at LOS E in the <br /> westbound direction dulrylrryling4 cptchCpe AM peak hour. <br /> ¢�I4RI4RI4��R�414�144144k4�a�.. <br /> 57 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.