Orange County NC Website
28 <br /> lib <br /> STIP# 1-5984- 1-85 <br /> I-5984 proposes to upgrade the I-85/NC 86 interchange in Hillsbfough.Right of way is scheduled for FY 2024,and <br /> construction is scheduled for FY 2026. 3 <br /> STIP# 1-5959-1-85 <br /> I-5959 proposes pavement rehabilitation on I-85 from west of SR 10 a nge Grove Road)to the Durham County Line. <br /> Construction is scheduled for FY 2028. <br /> STIP#1-0305-1.85 <br /> I-0305 proposes to add lanes to I-85 from west of SR 1006(Orange Grove Road)in Orange County to west of SR 1400 <br /> (Sparger Road)in Durham County. <br /> 1.3 Corridor Travel Demand Characteristics <br /> This section summarizes characteristics of travel in the study corridor,including historic and current AADTs and <br /> associated trends;truck/heavy vehicle volumes;traffic speeds;time-of-day characteristics;peak-period turning <br /> movements at signalized intersections;and relevant attributes of pedestrian,bicycle,transit,and rail modes. <br /> 1.3.1 Historic Traffic Volumes (AADTs) <br /> NCDOT's count program provides a consistent source of data for assessing traffic volume trends over time.There are <br /> multiple count stations on US 70 within the study limits.This study uses data from NCDOT's Traffic Count Database <br /> System for the years 2011-2022,as summarized in Table 1 and Figure 6. AADT estimates derived from StreetLight Insight <br /> and VHB's 2022 traffic counts were also considered. <br /> 26 US 70 Multimodal Corridor Study Existing Conditions Report <br />