Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> lib <br /> STIP# 1-5984- 1-85 <br /> I-5984 proposes to upgrade the I-85/NC 86 interchange in Hillsbfough.Right of way is scheduled for FY 2024,and <br /> construction is scheduled for FY 2026. 3 <br /> STIP# 1-5959-1-85 <br /> I-5959 proposes pavement rehabilitation on I-85 from west of SR 10 a nge Grove Road)to the Durham County Line. <br /> Construction is scheduled for FY 2028. <br /> STIP#1-0305-1.85 <br /> I-0305 proposes to add lanes to I-85 from west of SR 1006(Orange Grove Road)in Orange County to west of SR 1400 <br /> (Sparger Road)in Durham County. <br /> 1.3 Corridor Travel Demand Characteristics <br /> This section summarizes characteristics of travel in the study corridor,including historic and current AADTs and <br /> associated trends;truck/heavy vehicle volumes;traffic speeds;time-of-day characteristics;peak-period turning <br /> movements at signalized intersections;and relevant attributes of pedestrian,bicycle,transit,and rail modes. <br /> 1.3.1 Historic Traffic Volumes (AADTs) <br /> NCDOT's count program provides a consistent source of data for assessing traffic volume trends over time.There are <br /> multiple count stations on US 70 within the study limits.This study uses data from NCDOT's Traffic Count Database <br /> System for the years 2011-2022,as summarized in Table 1 and Figure 6. AADT estimates derived from StreetLight Insight <br /> and VHB's 2022 traffic counts were also considered. <br /> 26 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.