Orange County NC Website
26 <br /> lib <br /> ................................................................................................. ----------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 1.2.7.1 STIP Projects <br /> The current NCDOT 2020-2029 State Transportation Improvement Program(STIP)includes nine projects located within <br /> the project study area(see Figure 6).The nature,purpose,and schedule of each project is summarized below. <br /> Figure 6: Current 2020-2029 NCDOT STIP Projects in Corridortttt Sao <br /> , = �+ vhb. <br /> 57 <br /> Green <br /> Level - <br /> ��- <br /> Haw 4 •• <br /> River 70 _ __4 ice' <br /> ayMebane <br /> 1 - , <br /> Graham <br /> J <br /> Durham <br /> ire p5gri vi I I e ! , �� <br /> i � l <br /> int <br /> Legend <br /> US 70 Corridor Study Buffer Municipal Boundary * STTP Points within Project Area STIP Lines within Project Area <br /> ___ County Boundary Railroad Track Other STIP Projects ®Other STIP Projects <br /> 24 US 70 Multimodal Corridor Study Existing Conditions Report <br />