Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113 <br /> lib <br /> Findings and recommendations specific to the US 70 corridor include: <br /> ➢ AMP update recommendations that may impact US-70 or adjacent properties and intersections. <br /> ➢ Require right-of-way dedication-based on the"Street Cross-Section Requirements"below-for all development <br /> throughout the Planning Area and acquire necessary easements for infrastructure improvements. <br /> ➢ Work with NCDOT to pursue funding to advance the following improvements: <br /> o Install a traffic light at high frequency crash intersections to ensure safety for all users and assist traffic <br /> flow. <br /> o Install a crosswalk with a flashing light at key intersections in the planning area. <br /> ➢ Consider a provision that any development having ingress/egress in the Planning Area either construct its fair <br /> share of recommended improvements or provide payment in lieu of such improvements. <br /> ➢ Work with developers,the Orange County Economic Development Department,and Orange County Planning <br /> and Inspection Department to implement access management recommendations. <br /> ➢ Identify and promote transportation projects in the planning area to respective planning organizations and <br /> NCDOT. <br /> ➢ Pursue NCDOT SPOT Safety projects for key intersections throughout the planning area. <br /> ➢ Support NCDOT's Complete Streets Policy,which was being updated at the time this Plan was prepared,to <br /> address multi-modal travel and protect pedestrian and bicycle circulation around residential subdivisions and <br /> commercial areas. <br /> ➢ Take transit services into consideration as the E-B-M AMP is implemented.Currently,Orange County <br /> ➢ Public Transportation operates one route in the planning area called <br /> ➢ Intersection improvements for US-70 include: <br /> o West bound left turn lane. <br /> o East bound right turn lane. <br /> o Northbound right and left turn lane. <br /> o Recommendations include a roundabout at US-70/1-85 Connector. <br /> 2019 Eno New Hope Plan <br /> The goal of this project is to provide an actionable plan for ensuring wildlife habitat connectivity across the landscape of <br /> the Eno River and New Hope Creek-Jordan Lake watersheds through minimizing the impacts from future land uses <br /> changes. <br /> 111 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.