Orange County NC Website
106 <br /> lib <br /> ➢ Recommendations include new sidewalk connections,new raised medians,further monitoring for signalization <br /> and other crash modifications safety improvements at Fifth/Jackson. <br /> ➢ The study did not examine traffic impacts of a shopping center in development for Fifth/Washington. <br /> ➢ The signalized Fifth Street and Center Street intersection is projected to operate at LOS B during both the AM and <br /> PM peak hours,with or without the roadway project,under both the 2025 and 2035 conditions. <br /> ➢ The signalized Fourth Street and Center Street intersection is projected to operate at LOS A during both the AM <br /> and PM peak hours under the Existing conditions.It is projected to operate at LOS B under both the 2025 No- <br /> Build and Build conditions, and at LOS B or C under 2035 No-Build and Build conditions. <br /> ➢ Based on travel demand analysis,traffic volumes are expected to continue to increase in the study area(5-10%by <br /> 2025,20-25%by 2035)due to ambient growth and background developments, despite that completion of NC 119 <br /> Bypass is expected to result in 9-14%traffic reductions at the Fifth Street and Center Street intersection. <br /> 2022 GoTriangle Mebane Park-and Ride Feasibility Study <br /> The GoTriangle Mebane Park-and Ride Feasibility Study was launched in March 2022 to investigate potential new <br /> locations for a permanent or leased park and ride facility in Mebane.A pool of potential parcels was identified,evaluated <br /> for viability,and narrowed based on their ability to meet the study goals and objectives identified by GoTriangle and key <br /> stakeholders.The preferred purchase site is located on Washington Street, across the railroad tracks from US-70 in East <br /> Mebane.The plan includes conceptual development at the preferred site including parking facilities,amenities,and a <br /> driveway to service the residences.The site currently has access to a water line,but no sewer mains.Orange County is <br /> considering expanding utilities north of the interchange. In addition,the parcel was chosen in part because it has no <br /> signalized intersections between the proposed site and I-40/85. <br /> Hillsborough Future Land Use Plan / March 11, 2013; revised June 9, 2014 <br /> The Hillsborough Future Land Use Plan was adopted as part of the Hillsborough Comprehensive Plan and is subject to <br /> amendments following the procedure established in the Unified Development Ordinance(UDO). <br /> Important changes shown in the plan are a new mixed-use area north of the future train station,mixed residential <br /> neighborhoods in the urban service area,on the outskirts of the existing town limits,and employment,suburban office, <br /> and neighborhood mixed use areas on either side of 1-40. <br /> Traveling eastward along the U.S.70 corridor from the Town limits,the majority of land uses consist of Residential and <br /> Mixed-Use categories.This land uses are typically more conducive to pedestrian and bicycle infrastructure: <br /> 104 US 70 Multimodal Corridor Study Existing Conditions Report <br />