Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> lib <br /> Segment B <br /> Segment B extends through the Buckhorn Road intersection east to Lloyds Dairy Road.Land use along this segment is <br /> mixed suburban-rural,with industrial,institutional,commercial, residential,and even some agricultural uses.The latest <br /> DCHC MPO CTP(amended March 9,2022)identifies this segment of US 70 as a Major Thoroughfare(2-lane),and the <br /> plan recommends improvements with respect to transit service. Key roadway attributes include the following: <br /> • The prevailing roadway cross-section is two lanes with paved 2'-4'shoulders. Some intersections have left-turn <br /> lanes. There are no sidewalks or bicycle facilities. <br /> • The speed limit is 45 mph throughout. <br /> • Estimated 2022 AADTs range from about 5,000 vpd to a high of approximately 7,500 vpd <br /> Segment C <br /> This segment extends eastward from Lloyds Dairy Road through the NC 86/Churton Street intersection.The western end <br /> of the corridor includes an unusual high-speed interchange with the I-85 Connector that does not serve eastbound US 70 <br /> traffic and incorporates an unorthodox left-lane exit(westbound) and a mainline yield(eastbound). This design presents <br /> particular challenges to pedestrians and bicyclists. Immediately east of this interchange is a narrow bridge over the Eno <br /> River,followed by a significant hill and curve.Land use along this segment is mixed suburban-rural,with industrial, <br /> institutional,commercial,residential, and even some agricultural uses. <br /> The latest DCHC MPO CTP(amended March 9,2022)identifies this segment of US 70 as a Major Thoroughfare(2-lane)in <br /> need of multimodal improvements,primarily related to bicycle and pedestrian accommodations,as well as transit service, <br /> including a park&ride lot near Revere Road.The I-85/US 70 Connector interchange is cited for conversion to a full <br /> access connection.Key roadway features include the following: <br /> • The prevailing roadway cross-section is two lanes with paved 2'-4'shoulders,with the exception of the I-85 <br /> Connector interchange,where the eastbound and westbound lanes separate,and an additional lane is added to <br /> the entry/exit roadways.There are turn lanes at major intersections,but sidewalks and crosswalks(with <br /> pedestrian signals)are only at the Revere Road/Faucette Mill Road intersection. <br /> • West of the Hillsborough Town Limits,the speed limit is 50 mph,except for a short 55 mph segment though the I- <br /> 85 Connector interchange.The speed limit is 45 mph within the Hillsborough Town Limits. <br /> • Estimated 2022 AADTs are around 5,000 vpd west of the 1-85 Connector,jumping to nearly 12,000 west of the <br /> Connector and increasing to about 15,000 vpd at NC 86/Churton Street. <br /> 8 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.