Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 11:54:58 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 11-14-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> lib <br /> STIP# U-3109A- NC 119 <br /> U-3109A proposes to relocate NC 119 from I-40/I-85 to north of SR 1921 (Mebane Rogers Road).The project is currently <br /> under construction. likw'' <br /> STIP# RX-2007B- Norfolk Southern Railroad <br /> RX-2007B proposes to install active warning devices at Norfolk Southern Railroad crossing 735145T near Efland. <br /> Construction is scheduled for Fiscal Year(FY)2023. <br /> STIP#C-5184-Riverwalk Trail <br /> C-5184 proposes to construct a paved, off-road trail along the Eno River and construct a sidewalk to provide bicycle and <br /> pedestrian connectivity to the greenway as part of the Riverwalk Trail. <br /> STIP#P-5701A1B-Norfolk Southern Railroad <br /> P-5701A proposes to construct a passenger rail station building,site access,utilities,and parking, and P-5701B proposes to <br /> construct a station platform and realign the curve for the Norfolk Southern Railroad H-Line at milepost 41.7 in <br /> Hillsborough. Construction for P-5701A is scheduled to begin in FY 2022,and P-5701B is scheduled to begin in FY 2023. <br /> STIP# U-5845-SR 1009 (South Churton Street) <br /> U-5845 proposes to widen SR 1009 (South Churton Street)to multilanes from 1-40 to the Eno River in Hillsborough.Right <br /> of way acquisition is scheduled to begin in FY 2029,and construction is currently unfunded. <br /> STIP#TD-5295-GoTriangle <br /> TD-5295 proposes to construct a GoTriangle park-and-ride lot in the Town of Hillsborough.Construction is scheduled for <br /> FY 2023. <br /> 25 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.