Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 11:54:58 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 11-14-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> lib <br /> 1.2.4 Pedestrian Facilities <br /> Sidewalks are largely absent from both the US 70 and US 70 Business corridors(Figure 5).The exception to this is where <br /> US 70 travels through the City of Mebane,where there is nearly a mile stretch of sidewalk on the north side of the road <br /> between the Mebane Community Park driveway and 9th Street.There are also marked crosswalks,pedestrian signal <br /> heads,and ADA features(curb ramps and tactile warning strips)at the signalized intersections at Third Street and Fourth <br /> Street in Mebane. However,not all of these treatments were constructed in accordance with current best practices. For <br /> example,several curb ramps lead into the center of the intersection rather than aligning with the sidewalk/pedestrian <br /> access route. Some pedestrian improvements are planned. <br /> There are two short stretches of sidewalk where US 70 travels through the Town of Hillsborough.One stretch of sidewalk <br /> (approximately 350')is in front of the Walgreens near the intersection with US 70 Business(Churton Street),though the <br /> sidewalk does not front the road and therefore does not connect to the bus stop.There is also a small segment of sidewalk <br /> on the north side of US 70 and marked crosswalks,pedestrian signal heads,and ADA features at Faucette Mill Road.The <br /> crosswalks at this intersection mainly serve pedestrians traveling north-south on Faucette Mill Road/Revere Road.Worn <br /> paths along the shoulder of US 70 were also observed in Hillsborough,suggesting that pedestrians are walking along the <br /> roadside,particularly between US 70 Business(Churton Street) and Faucette Mill Road. <br /> Sidewalks are absent near Efland Cheeks Elementary School Road(4401 Fuller Rd,Efland);however,no children have <br /> been observed walking along US 70. <br /> There are also several short stretches of sidewalk present on the US 70 Business corridor.There is sidewalk present on the <br /> south side of US 70 Business directly in front of Sport Endeavors.There are also segments of unconnected sidewalk on <br /> either side of US 70 Business near the Poplar Ridge neighborhood and marked crosswalks at the intersection of Quincy <br /> Cottage Road and a midblock crosswalk in front of the Orange County Sportsplex. <br /> 20 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.