Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 11:54:58 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 11-14-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> lib <br /> 1.2 Transportation Infrastructure <br /> 1.2.1 US 70 Roadway Design Elements <br /> US 70 is a basic 2-lane highway,most of which has 4'paved shoulders and 120'ROW.Thirteen intersections along this <br /> 18.9-mile segment are signalized.Driveways and intersections are frequent,but visibility is often adequate.The terrain is <br /> mildly-to-moderately rolling,with some significant vertical and horizontal curvature,though not excessive for the <br /> primarily 45 mph speed limit.There are no bicycle facilities and limited pedestrian facilities along the corridor. <br /> 1.2.2 US 70 Intersections <br /> Within the study area,US 70 and US 70 Business intersect approximately 95 public streets,and numerous private roads <br /> and driveways. 15 intersections are currently signalized (see Figure 3). <br /> k�y�ylyly h�p, <br /> 12 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.