Orange County NC Website
14 <br /> Nishith Trivedi said that there are multiple park and ride lots proposed for the future. He <br /> said there are transit improvements as well. <br /> Slide #7 <br /> Multimodal Corridor Recommendation <br /> BikeOpedestrian MMIM <br /> Scqmcnt - , <br /> advvay fSUP) M <br /> 1 $ 2.800,000 $ 5,100.000 $7,900.000 <br /> 2 $ 14,600,000 $ 1,800,000 16,400,000 <br /> 3 S 30,800,000 $4.600.000 ►35.400,000 <br /> 4 $ 16,400,008 $ 3,100,000 19,600,000 <br /> 5 S 29.600.000 $ 3.100.000 $32,700.000 <br /> 6 $2010Q000 $ 3,300,000 $23,400,000 <br /> 7 $ 37.400.000 $5,800.000 $43,200,000 <br /> Project Cask <br /> 6 S�tS <br /> r �aa <br /> Sao <br /> �f5 <br /> dip <br /> 3epmerrt 1 2 3 4 8 B 4 <br /> ■HlgwayJRoadway ■BIWped. <br /> Source'Probi1c WorkshM#2,Phrase 9 A 2 Report 6 <br /> Nishith Trivedi said that all pieces included a shared use of the bike path and 10% was <br /> added for the bike/ped piece. He said the green shows the additional cost. <br />