Browse
Search
Minutes-09-26-2023 Joint Meeting with School Boards
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2023
>
Minutes-09-26-2023 Joint Meeting with School Boards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 3:01:07 PM
Creation date
11/3/2023 2:24:58 PM
Metadata
Fields
Template:
BOCC
Date
9/26/2023
Meeting Type
Work Session
Document Relationships
Abstract for Joint Meeting – Board of County Commissioners, Chapel Hill-Carrboro City Schools Board of Education and Orange County Schools Board of Education
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 09-26-2023 BOCC Joint Meeting with School Boards
Agenda for September 26, 2023 Joint Meeting with Schools
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 09-26-2023 BOCC Joint Meeting with School Boards
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> Slide#25 <br /> ALT HIGH SCHOOL (CHCCS) - CURRENT STATE <br /> School Name yeareullt Total Square✓=eet oericiencyiotal FCI %Space Types %Spaceiypes> %Teaching/ Capacity 2022-21 2022-23 <br /> present min size Learning Tools Enrollment Utilization <br /> present <br /> Phoenix Academy 2009 15,282 $ 2,188,595 29% 8% 4% 5% 83 28 .34% <br /> 2009 15,102 $ 2188,595 29% 8% 4% 5% 83 28 34% <br /> f-! <br /> I # <br /> C FCI is 29/0° Low utilization >. • Low Educational <br /> c <br /> 0_ • 55 open seats CO Adequacy <br /> � N � <br /> C N <br /> Slide #26 <br /> ALT HIGH SCHOOL (CHCCS) - OPTIONS <br /> Planning Area Current Option Impact <br /> Condition <br /> CRCCS_ALTHS Option Description Capacity Enrollment FCI utilization Needs(0-5 Total Option Resulting Resulting <br /> years} Investment Capacity Utilization <br /> Option A Priority Maintenance $1,726,291 83 34% <br /> Option a Renovation to Improve Condition&Adequacy $5,711,469 62 45% <br /> 83 28 29% 34% $2,188,595 <br /> Option C N/A <br /> Option O N/A <br /> Commissioner Richards asked if there was a programmatic decision made about the <br /> alternative high school that affects the recommendation. <br /> David Sturtz said they have not made a decision about this but there have been <br /> discussions about relocating. <br /> Al Ciarochi said that the program is packed, and expansion is a future consideration <br /> because the facility is being used at 100%. He said that if there are any spaces in the district that <br /> become available, they would consider that for alternative programs in the district. <br />
The URL can be used to link to this page
Your browser does not support the video tag.