Browse
Search
Agenda - 06-04-2002 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 4:04:27 PM
Creation date
8/29/2008 10:39:21 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
S ORD-2002-015 OWASA Conservation and Demand Management Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> customer demand,as discounted on the basis of contain row waver usage during <br /> the months of May through September of the previous calendar yea; <br /> Irma_ Ifths average raw water demendaterme theprevous summerwae <br /> 10.8 mullion gallons per day(MGD), and the OWASA reservoir sysem cmreedly <br /> camained2.8 billion gatlans afwarer in storage, the total volume ofstmed water <br /> wouldbeequalro2.8billicr iO..8MGD=159daysofdemarude Thoexample <br /> would not corporate a Stage I Water Shortage]; <br /> or <br /> b) It u ofiawdset determined that the Cane Cre Ac Uwversity Lake/Stone Quarry <br /> system is unable or unidedy W continue meeting the demands of OWASA's <br /> customers without a substantial reduction in consumption; <br /> or <br /> c) The customer demand for water averaged over free successive days,as measued <br /> by OWASA production meet&,exceeds 90 percent of site target three-day,peak <br /> limit established for that yew. Target Ihrdts may be established each April by <br /> multiplying average finished water demands for the previous 12 routine by a <br /> peaking factor of 1.65, or may be established by other production conmaints- <br /> stab as seater neammnt capacity—detemined by OWASA'a Executive Director. <br /> r&xamnler /faueregefinished water desmandfor the previous 12 months was 95 <br /> MGD, then the target limitfor the coming summer would be 95 MGD s 1.65- <br /> 15.1MGLt A water shortage would be declared he the demurd, when averaged <br /> over three successive days, exceeded 90 pereeru of that target level;e.g., 0.90x <br /> 15.7 VGD- 141 dfGD] <br /> 2. Any of the fofowing conditions,so determined by OWASA's Executive Director, <br /> shall comtitain a Stage If Water Shortage: <br /> a) The total volume of water stored m OWASA's Cane Creek/(Jmivemity LSka'Sroner <br /> Quarry morem,on system ie equal to or less than 75 summer days of OWASA <br /> customer demand,as determined on the basis of average mw water usage during <br /> We months of May through September of the previous calwdar yea; <br /> or <br /> b) It is cNerwise demermined that to Cane Creek/Univetsiry Lake/Stone Quany <br /> system is unable or unlikely to continue meeting the demands of OWASA's <br /> customers without a substantial redaction in consumption; <br /> or <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.