Browse
Search
Agenda - 06-04-2002 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 4:04:27 PM
Creation date
8/29/2008 10:39:21 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
S ORD-2002-015 OWASA Conservation and Demand Management Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Thomas S. c"tye, P. Z. _ <br /> April 23, 1999 <br /> Page 4/c 35 <br /> i. A mihimhe flow must be released from the dam site at all <br /> times, even during COoatmaCtimM, in accordance %11th the <br /> eac7c"d schedule entitled `Minimulm Stream Siam Release <br /> Sehedile - _illsbvreugh Water Supply Dam, Grange County.' <br /> 1. ?reject co¢struction..She11 be a - _ ised by e . Scb=.p. . <br /> Poetzsch, F. R. <br /> 3 . During construction the Division of" Land Resources may <br /> reQ ire such orogia55 retorts as are. daimed necessary. <br /> -. Details ier the Settlement MUMUMEACS shall be _orovided o <br /> revised contraction drawings and on "a - <br /> as-built-drawings. - <br /> S. The location. and details of the stream cage station shall he <br /> provided with the •aa-built• dzawi¢gs. <br /> 9. A almimum of two Shelby tube samples shall be-obtained from <br /> the emhankment after c msbructien of the embankment the been <br /> Completed. TrinXial shear tests shall be _Patio read on the "'- <br /> saamles to verify the stability analyses. B conies me the <br /> data and stability analyses based on the results of the <br /> -tests shall be provided to the Division Of Lend Resources. <br /> 7 . TwO copies at the menu5accurax's literature for the type Of <br /> joint sealant sad man actzar's recommeaded Primer shall be <br /> submitted to the Division of Land Resources fcr review and <br /> vtroval Orion to aFplicatioa of the a- m t <br /> r and sealan - <br /> (Reference Specifications-, 'Page 03100-5, <br /> section 2.J.F.) <br /> a. Beck£ill adjacent to and against structures shall he placed <br /> in maximum uniform loose lifts mot exceeding.six lnchea. <br /> This requirement small be reelected in revised eonstmuctiom <br /> specifications., (Reference Specifications, Page b2300-9 . ' <br /> 9actica 3 .1 .K.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.