Orange County NC Website
22 <br /> 1 Nishith Trivedi said that traffic impact analysis done for development does not include <br /> 2 widening because it is not existing right now. He said the watershed was addressed and <br /> 3 improvements made in accordance with the county's plans. <br /> 4 <br /> 5 Slide #19 <br /> Issues Addressed <br /> 0 Southern Orange County can simply use the widened 1-40. <br /> • Southern rural County residents and businesses,must not be over-burdened and <br /> underserved by transportation investments made to benefit just the northern and <br /> eastern,urban,or other regional commuters. <br /> • 1-40 widening may help but it serves a totally different function then NC 54 <br /> • Phase 2 demonstrated destination and origin patterns between Chatham, <br /> Orange and Alamance Counties travel behavior are using AJC 54,Not 110. <br /> a Safety and Operational improvements anticipated along '.NC-54(R-5321A) <br /> • Traffic is back to pre-covid levels and accidents rates are on the rise,especially <br /> i nju ries and fatalities_ <br /> • Complete scoping,engineering to start in 2027 for possible:3 left tum lanes <br /> • Construction may fund up to 3 of them. <br /> • Hatch road—west bound left turn lane(CarrborolETJ) <br /> • Southern driveway at NC 54-driveway access(CarrborolE J) <br /> • American Stone Company driveway access(Orange County) <br /> • Should construction be funded,any bikelped will require local match <br /> • Currently not a locally adopted plan <br /> • subject to rescoring in SPOT 7, if not successful,project is removed from STIP <br /> Designation and Origin-Google and Streetlight technology-travel is predominantly <br /> on NC 54 for all of southern Orange County,from BurlingtonlGraham to areas beyond <br /> Chapel Hill and Carrboro_not 140 <br /> 6 T <br /> 7 Nishith Trivedi said that the R5021A is funded for engineering and includes three left turn <br /> 8 lanes. He said there is a possibility of funding all three and they are near the Hatch Road area. <br /> 9 He said this will not address the safety issues highlighted in Southern Orange County. <br /> 10 <br /> 11 Slide #20 <br /> Action <br /> o Manager recommend BCOCC approve NG 54 Multimodal Corridor Study <br /> 12 <br />