Browse
Search
Agenda 11-02-23; 6-a - Orange County Climate Action Plan and Greenhouse Gas Inventory – Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-02-2023 Business Meeting
>
Agenda 11-02-23; 6-a - Orange County Climate Action Plan and Greenhouse Gas Inventory – Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 11:54:31 AM
Creation date
10/26/2023 12:00:17 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 2, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-02-2023 Business Meeting
Minutes-11-02-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GOALS AND STRATEGIES <br /> ft, , 1MWVMTrVT7r, TVSV, <br /> GY-- <br /> LOOKINGTO2050 <br /> GOAL TARGET <br /> STRENGTHENBE 1 ••• EMISSION <br /> REDUCTIONENERGY EFFICIENCY AND AROF <br /> CONSERVATION SCOPEAND 2 EMISSIONS <br /> BY 2030 AND 100% BY 2050 <br /> USING A 2005 BASELINE <br /> STRATEGY ACTION <br /> BE 1.1 BE 1.1.1 <br /> Continue to strengthen policies for Achieve a 20%energy usage reduction in energy consumption by <br /> yearly reductions in energy use in 2035 using a 2019 baseline <br /> County operations BE 1.1.2 <br /> TIER: FOUNDATIONAL Install energy-efficient technologies in two County facilities each year <br /> from 2024-2029, prioritizing those facilities that have the highest <br /> PRIORITY SCORE:6.50 energy use <br /> CO-BENEFITS: <br /> 000000 <br /> STRATEGY ACTION <br /> BE 1.2 BE 1.2.1 <br /> Continue the transition to efficient Replace traditional lighting with LEDs in all county facilities by 2030 <br /> lighting and green infrastructure BE 1.2.2 <br /> across all County facilities Evaluate high energy use in two County buildings for deployment of <br /> green infrastructure measures,vertical gardens,and tree plantings,to <br /> TIER: FOUNDATIONAL reduce energy used to cool these buildings by 2030 <br /> PRIORITY SCORE:5.25 BE 1.2.3 <br /> CO-BENEFITS: Transition to motion sensor lights that automatically turn off during <br /> 00090 evening hours <br /> 2023 CLIMATE ACTION PLAN ORANGE COUNTY, NORTH CAROLINA 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.