Browse
Search
Agenda 11-02-23; 6-a - Orange County Climate Action Plan and Greenhouse Gas Inventory – Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-02-2023 Business Meeting
>
Agenda 11-02-23; 6-a - Orange County Climate Action Plan and Greenhouse Gas Inventory – Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 11:54:31 AM
Creation date
10/26/2023 12:00:17 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 2, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-02-2023 Business Meeting
Minutes-11-02-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> I'LATIPODUCTIOIV- <br /> LOCAL PLANNING CONTINUED <br /> In addition to the agency collaborations underway, the County has taken into <br /> account the alignment of regional commitments. Following state guidance, <br /> the County will work with its neighboring cities and university to share funding <br /> resources and best practices and maintain a dedicated focus to work collectively <br /> to ensure that these commitments stay on course.Table A portrays a snapshot of <br /> current state and regional commitments. <br /> SECTOR ORANGE COUNTY STATE CHAPEL HILL _.-. <br /> Electrify fleet passenger <br /> Z vehicles,light and medium duty <br /> O EO 246:Establishing targets Reduce 2010 levels of <br /> Increase community EV trucks by 2040,and all heavy <br /> p adoption to 50%by 2035 of 1.25 million zero-emission duty vehicles by 2050 GHG emissions from <br /> c and 100%b 2050 vehicles registered and 50%of motor vehicle use by 80% <br /> Q y sales by 2030 Replace diesel buses and by 2030 <br /> LU support vehicles with all-electric <br /> options over the next 20 years <br /> EO 246.The order requires Create walkable,bikeable, <br /> Decrease vehicle miles Reduce GHG Emissions <br /> NC DOT to develop actionable transit-served neighborhoods, <br /> � traveled(VMT)30%from a from Motor Vehicle Use by <br /> > strategies for Vehicle Miles Increase walking,biking and <br /> 2019 baseline by 2050 Traveled(VMT) transit use(mode-shift) 80%by 2030 <br /> Municipal goal updated <br /> in 2020 to reduce 2010 <br /> EO 246.Reduce statewide levels of municipal <br /> Z N Achieve 50%emission Halfway to net zero by 2030: p <br /> N LU reduction target by 2030 GHG emissions to at least 50% 15%of commercial,30%of emissions 80%by 2030 <br /> below 2005 levels by 2030 and <br /> 2 0: and 100%by 2050 using a residential,100%of Town Community goal updated <br /> w 2005 baseline achieve net zero emissions by s buildin <br /> 2050 g in 2020 to reduce 2010 <br /> levels of community <br /> emissions 80%by 2030 <br /> Achieve 100%clean HB 951.Reduce electric Projects on Town <br /> > <br /> O renewable energy by power sector greenhouse gas 80%clean renewable energy by buildings,includingsolar leasing;dedicate <br /> z2050 in municipal and emissions by 70%below 2005 2030;100%by 2050 adequate funding to these <br /> LU community sectors levels by 2030 <br /> projects <br /> LU <br /> J <br /> Q There are 31 community solar <br /> wIncrease the%of projects that operate in 93 of Pursue Community Solar <br /> Z <br /> community wide solar by 100 counties in North Carolina Green the Grid;Participating in Projects;Participate in <br /> a: 25%by 2035 providing electricity to 25%of Solarize the Triangle Solarize the Triangle <br /> North Carolina residents <br /> Z Complete an electrification <br /> O <br /> study and establish a <br /> a All-electric new construction Facilitate Low Cost <br /> Q long-term implementation et-zero emissions for new N <br /> standards;All newly sold Financing for Energy <br /> plan(Phase 1 and Phase appliances are high-efficiency construction;Energy audit Efficiency and Renewable <br /> r 2)for both municipal and models requirement at time of sale Energy Projects <br /> M community infrastructure <br /> LU by 2025 <br /> Table A: Current State and Regional Commitments <br /> 2023 CLIMATE ACTION PLAN ORANGE COUNTY, NORTH CAROLINA 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.