Orange County NC Website
14 <br /> 1 Nishith Trivedi said that there are multiple park and ride lots proposed for the future. He <br /> 2 said there are transit improvements as well. <br /> 3 <br /> 4 Slide #7 <br /> Multimodal Corridor Recommendations <br /> $ <br /> 3 $ 30.800 000 $4.600,000 35.400.000 <br /> 4 $ 16,400,000 $ 3,100,000 19,600,000 <br /> 5 $29,600.GQG $ 3,106,000 5 32..700,000 <br /> 6 $20,100.000 $ 3,300,000 S 23_400,000 <br /> 7 $ 37,490,GOG -$ 5,800,040 S 43.200,000 <br /> PrOPO GOSI <br /> sao <br /> Baa <br /> s.� <br /> Sip <br /> S-S <br /> Segment P 3 4 3 a ? <br /> wHigway?Roadway nBlWp-ed. <br /> 5 Source_PuNic Wc)rk,shop# ; Phase I A 2 Report 6 <br /> 6 Nishith Trivedi said that all pieces included a shared use of the bike path and 10% was <br /> 7 added for the bike/ped piece. He said the green shows the additional cost. <br /> 8 <br /> 9 <br />