Browse
Search
Agenda - 06-04-2002 - 9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:57:19 PM
Creation date
8/29/2008 10:39:19 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> RECOMMENDATION(S): The Manager recommends that the Boats: <br /> 1. Approve the establishment of three new full-time permanent positions to support the <br /> Regulated Recyclable Materials Ordinance and associated operations as follows: <br /> • Solid Waste Materials Transfer Operatorat Grade 63 <br /> • Landfill Inspectorat Grade 63 <br /> • Administrative Assistant ll at Grade 62 - <br /> 2. Amend the Orange County Classification and Pay Plan to add the new class of Solid <br /> Waste Materials Transfer Operator at Salary Grade 63. <br /> 3. Award bids for equipment as follows, and authorize the Purchasing Director to execute <br /> the appropriate paperwork. <br /> • Horizontal Grinder-Pioneer Machinery LLC of Sanford, North Carolina in the amount <br /> of$501,382.76 <br /> • Trammel Screen - Screening 8 Shredding Systems of Winston Salem, North Carolina <br /> at a delivered cost of$132,210.00 <br /> Live Floor Trailer-Consm Steel Corporation of Paints of Rook, Maryland at a <br /> delivered cost of 546,872.00 <br /> • Crawler Loader-Gregory Poole of Raleigh, North Carolina at a delivered cost of <br /> $204,803.00 <br /> • Stacking Conveyor—POwerscreen Mid-Atlantic at a delivered cost of$29,4p17. <br /> 4. Authorize the Finance Director to negotiate equipment financing arrangements with a <br /> local financial institution based on terms of 3.75% interest and a 59 month payback <br /> period, and to execute all necessary financing documents_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.