Browse
Search
Agenda - 06-04-2002 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:56:06 PM
Creation date
8/29/2008 10:39:16 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 5 <br /> American Stone Company will also have the initial responsibility, at their expense, to <br /> determine whether the well failure is a probable result of the quarry operation. If the <br /> determination is made that the well failure is a probable result of the operation, <br /> American Stone has complete and sole responsibility to repair or replace the well and <br /> the resident is not eligible for the NFWRF monies. The County or OCHD will not be <br /> Involved with the negotiations when a well fails as a probable result of the quarry <br /> operation except to provide water sampling and technical expertise when requested. <br /> Well permits and inspections for replacement wells will be required and fees for those <br /> services will be paid out of the NFWRF, the resident, or American Stone as indicated <br /> by the findings or negotiations. <br /> Well failure will be defined in terms of problems with either quality or quantity. <br /> Following is a short description of what constitutes a well failure in both those <br /> categories and the procedures through which determination will be made in each <br /> category. <br /> uantit : A well must be able to produce a minimum of ]SO gallons per day or <br /> 100 gallons per permanent resident of the home, whichever is greater. The <br /> assessment of the well quantity will involve determining the total depth of the <br /> well, the total flow of the water zones in the well, the depth that the pump can <br /> effectively pump water, and any other factor that affects the quantity of water <br /> the well can produce. <br /> Quality: A well must produce water that meets the current or future primary <br /> drinking water standards of the US EPA or the State of North Carolina, or other <br /> standards established by the Orange County Board of Health deemed necessary <br /> to protect against long term or short term adverse health effects. Assessment <br /> of well water quality may Include sampling, videotaping the well casing/bore- <br /> hole, or other actions necessary to determine the water quality from the well. <br /> The following findings do not constitute awell failure: <br /> • An inoperable or insufficient pump serving the well (see section on pumps <br /> bel <br /> • Inoperable or insufficient wiring or plumbing serving the well <br /> • Water treatment systems installed prior to this policy that were improperly <br /> installed or maintained <br />
The URL can be used to link to this page
Your browser does not support the video tag.