Browse
Search
Agenda - 06-04-2002 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:56:06 PM
Creation date
8/29/2008 10:39:16 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�c�23871x:: 337 <br /> qualified residents of the community in the area of the quarry by considering these residents 6i <br /> before others for job openings that occur during We time American Stone operates the <br /> quarry. <br /> 35, OWASA Shall tame the reservoir that results from the expansion of the quarry after the <br /> community in which it is located. <br /> 36. American Stone Company shall sponsor an annual neighbor day for residents living within <br /> a 3,000-foot radius of the perimeter of the property encumbered by this special use permit <br /> for the purpose of maintaining constructive communications with the neighbors and to offer <br /> a planned foram in which neighbors might ask questions about American Stone Company's <br /> opcmdon. <br /> 37. OWASA shall provide a special forum for citizens who live in the area of fe quarry,to <br /> speak with the OWASA Board of Directors about their concerns. <br /> 38. Operations associated with the extraction of earth materials and the reclamation of the <br /> property m the conclusion of mining will be in conformance with the standards set out in <br /> Section 8.8.1.2 of the Ordination:as it anciently exists,Mining Permit 4 6"2 as modified <br /> and the approved Reclamation Plan filed in accordance with Mining Permit 969-02. In the <br /> vent of any inconsistency between the Orchestra and the Mining Permit the stricter <br /> requirements shall convorL <br /> 39. A security fence of at least 6'in height shall be installed around the entire circumference of <br /> the pt and plant area <br /> 40. Berms consisting of spoil and by products form operations shall be located as shower on the <br /> approved site plan and shall not reach a height greater than 40'above the original contour <br /> and shall not be ended so that the vertical slope exceeds the material's natural single of <br /> rtpuse. <br /> 41. Applicants shall submit operational reports to the County Manager,or designee,on an <br /> annual basis derailing the amounts of materials extracted,extent of extractive area,depth of <br /> extractive area and ground water test boring to the County. <br /> 42. The petition to close existing Bctfal Hickory Grove Church Stand(SR 1104) shall not be <br /> considered until the relocation and construction of the new SR 1104 is complete and <br /> accepted by NCDOT. <br /> 43. Prior to subminal of the Bethel llickpry Grove Church Road(SR 1104)connotation <br /> drawings to NCDOT,the Orange County Erosion Control shall review and approve an <br /> erosion control plan. <br /> 44. A 100 feet Type F buffer shell be retainedlinstalled around the entire perimeter of the <br /> petitioned site. <br /> 45. The travel width pavement after mincored Bethel Hickory Grove Church Road(SR 1104) <br /> shall be a minimum nf24 feet. In addition,on each side of the entire length of the road,a- <br /> foot,paved bicycle lanes shall be built in accerdaoce with NCDOT specifications. <br /> 46.The ultimate right-of-way cross-section for NC 54 shall be 100 feet at its intersection with <br />
The URL can be used to link to this page
Your browser does not support the video tag.