Browse
Search
Agenda - 06-04-2002 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-04-2002
>
Agenda - 06-04-2002 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:56:06 PM
Creation date
8/29/2008 10:39:16 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20020604
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
icc,2367 wr 332 <br /> 9 <br /> 0. Stockpiles and overburden piles shall be s. least stand not all streams on the site except <br /> where protected by approved catch basins.This shall not applyle sefinered,sded berms or <br /> beans under construction. The maximum height ofNe stockpiles referenced on site plan <br /> drawing 42 shall not exceed forty(40) feet maximum. <br /> 5. The hours of operation of the pit and processing plant will not exceed the time from 7:00 am <br /> -7:00 pm Monday through Saturday. <br /> 6. The stream bed and banks of the channeled portions of PIR's Crest and the areas <br /> around the setting ponds shall be stabilized. The applicant shall have a continuing program <br /> of fertilization and maintenance on areas adjacent to the smeambed of Phil's Creek and <br /> amund the sealing pond. <br /> 7. Applicants shall maintain a 50-foot happen between the excavation pit and Phil's Creek. The <br /> 50JOOt buff shall remain in a natural state to be maintained by American Stone Company. <br /> S. A water wagon shall be operated at the site as needed to keep dust leaving the site to a <br /> 9. One year prior to the end of the extmcton process,American Stone Company shall <br /> Purify Orange County in writing of its intention to cease mining. The County shall <br /> tour he site to commune what areas that need further preparation for the closing of <br /> the site Of particular concern on this inspection will be: <br /> (i) net the sending ponds are fully stabilized and the spillway is in pod <br /> condition. <br /> (Ib That overburden and spoil piles have been completely graded and sloped to <br /> prevent slippage and erosion. <br /> (iii) That the slopes are stabilized and se dad to Orange County standards. <br /> (iv) That the site be adequately prepared for conversion to a reservoir <br /> 10.The applicants will ratify Outage County in writing of the expected final date of operations. <br /> Orange County will not release the rehabilitation bond until operations have ceased and all <br /> real that have been climbed,Worked,sloped,cap. have been stabilized to Orange County <br /> standards. <br /> - 11.A rehabilitation band guarantee shall be posted with Orange County in a form <br /> acceptable to the County Anthony in at amoum equal to the cos of rehabilitation as <br /> certified by a registered engineer employed by American Stone Company,less the amount <br /> required by the State of North Carolina pursuant to the North Carolina Mining Act. <br /> 12. No blasting or Acne processing east of the current location of SR 1104 shell take place <br /> within 500'ofary property line ofproperty not owned or leasod by O WASA or American <br /> Sane Company. <br /> 13. All quarrying operations shall cease no later than December 31,2030 at 12:00 noon. <br /> 14.Orange County will establish and administer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.