Orange County NC Website
t, <br /> PROCESS AND TIME GUIDELINES <br /> NO FAULT WELL REPAIR FUND REQUESTS <br /> AMERICAN STONE COMPANY QUARRY AREA <br /> A. Problems related to water quantity <br /> Process Steps Response Time Guidelines <br /> i. Request is received by Envirmnental Health Division(OCIiD) MA <br /> from residents or other n <br /> O FiD conmots Ammom Sane and advises than of the Contact made wilum 2 business <br /> request and the nature ofhere relined. days of re est. <br /> i. American Stone consultant visits site, rani a preliminary, <br /> investigation,and determines whether a well problem exists and Consultant visits site within 10 <br /> if the problem is a"probable result" of the quarry activity. no business days of request. <br /> consultant nits findings to OCH D. <br /> v. If the consultant Sods that me problems are a"probable remit' N/A <br /> of me operation,no further action is ineressary by 00 TD <br /> v. Based on afinding and report from American Slone did there is OCIID conPmes or chutes the <br /> well problem and it is not a probable result of the quarry, well £tune claim witllln i <br /> Groomoq OCHDusHwill: business days of resistor of the <br /> a. Confumawellfdilureexide,or Amedcn Stone Consultant report <br /> b. Deny the well failure clsim;or or recommends further study of <br /> c. RecmnmeW (mdr¢stud of the wall thewell. <br /> vi. For well failures that are not a probable result of the quarry <br /> operation, OCHE)staff recom amidst Strategy mmmded and <br /> a A remediation strategy - an uniformed, Orange County contionfor is coarser witltiv 10 <br /> representative commons the appropriate mvnaztor(s). (Go to business days of receipt of foal <br /> step viii);or Simple results or after results of <br /> b. FnrWe study by a private construct m determine the best "a study are complete. <br /> rema]'ation suote <br /> vii. Private cousermad completes study and reports to OCHD (go Depends on consultant sohedte <br /> back to vi-a. <br /> srid. Renediation analogy is effected Depends on contractor schedule <br /> Appeals shall be made within 30 <br /> days of to Issuance of a deal <br /> board on me Coding that no wall <br /> is Appealsby Neresidmlalvihe BaadofHedh failure exists or other funding; <br /> llrlsa[ISfac41[y <br /> to die reSdeAt. <br /> Oace made, appeals progress <br /> according to the Board of Health <br /> Policy on cats. <br />