Browse
Search
2023-594-E-OCTS Dept-WSP USA-Transportation Multimodal Plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-594-E-OCTS Dept-WSP USA-Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 2:46:36 PM
Creation date
10/24/2023 2:46:16 PM
Metadata
Fields
Template:
Contract
Date
9/29/2023
Contract Starting Date
9/29/2023
Contract Ending Date
10/13/2023
Contract Document Type
Contract
Amount
$150,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br />B3 Consolidated Map and Projects Table <br />The Consultant will use the shapefile and the atribute table to create a consolidated map and table of projects. The <br />Consultant will use ArcGIS Pro to create this map and it will be formated to fit a large plot size (22x34 or similar). The map <br />will have insets for areas with a higher density of projects. The table of projects will be created separately. <br />The Consultant will present the dra� map and table to the CTT and based on their comments, will revise this map. This <br />scope assumes revision to the map and table up to two (2) �mes. <br />Key Deliverables: <br />• List of plans to be considered for consolida�on (1) <br />• GIS Shapefile including selected projects from all plans (1) <br />• Master projects table including selected projects from all plans (1) <br />• Consolidated and formated map of projects (1) <br /> <br />TASK C: MULTIMODAL ANALYSIS <br /> <br />C1 Transporta�on Gap Analysis <br />This task will build upon the maps and data created as a part of Task B. In this task, the Consultant will use the maps from <br />Task B to iden�fy gaps in the planned system connec�vity. The Consultant will assess the exis�ng network and future <br />project links to iden�fy low hanging fruits in terms of connec�vity. The Consultant will focus on transit, rail, freight, <br />roadways, sidewalks, bike lanes, and mul�-use paths for this gap analysis. The Consultant will present these gaps to the <br />CTT to get their assessment of the poten�al solu�ons for the gaps in the network. <br />C2 Mul�modal Improvements <br />In this task, the Consultant will develop solu�ons for the gaps iden�fied in task C1. The Consultant will present the <br />preliminary recommenda�ons to the Client and the CTT, incorporate their inputs and modify the recommenda�ons <br />accordingly. These recommenda�ons will be presented to the public during the public engagement round and their <br />comments will be discussed with the CTT and the Client. These steps will culminate in the Consultant developing a final set <br />of mul�modal recommenda�ons to bridge the gaps iden�fied in Task C1. <br />Key Deliverables: <br />• Transporta�on Gap Analysis map (1) <br />• Dra� recommenda�ons to bridge the gaps - Client, CTT and Public review (1) <br />• Final set of recommenda�ons (table and map) (1) <br /> <br />TASK D: PUBLIC ENGAGEMENT <br />The key focus of this plan is to consolidate the plans that have already been adopted by the jurisdic�ons. Since the plans <br />have already gone through their own rigorous public engagement processes, we expect the Mul�modal Plan to require <br />one (1) round of Public Engagement to occur a�er the dra� mul�modal improvements plan as a part of Task C2. <br />Engagement will focus on introducing the planning process to the public, presen�ng the dra� mul�modal improvements <br />developed in task C2, and collec�ng feedback on community priori�es and goals to set stage for the project priori�za�on <br />in Task E. <br />D1 Task Coordina�on <br />Two (2) members of the Public Engagement team will par�cipate in one (1) pre-planning public engagement mee�ngs <br />with the Client to prepare for public engagement and review the strategy prior to the start of the engagement phase. The <br />strategy will include a detailed descrip�on of the planned engagement ac�vi�es, outcomes materials, and �meline of <br />produc�on. <br />DocuSign Envelope ID: 569754E1-D2B6-4DBE-B14F-1579C72E692B
The URL can be used to link to this page
Your browser does not support the video tag.