Browse
Search
2023-583-E-AMS- F A Jenkins Construction-MotorPool- Office Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-583-E-AMS- F A Jenkins Construction-MotorPool- Office Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 2:32:34 PM
Creation date
10/24/2023 2:32:27 PM
Metadata
Fields
Template:
Contract
Date
10/11/2023
Contract Starting Date
10/11/2023
Contract Ending Date
10/17/2023
Contract Document Type
Contract
Amount
$3,595.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F A Jenkins Construction, Inc <br />402 Avalon Dr <br />Mebane, NC 27302 <br />Office (336) 260-1001 <br />Mjenkins31@triad.rr.com <br /> <br />DATE: OCTOBER 5, 2023 <br /> <br /> TO: Alan Dorman <br />Orange County Asset <br />Management Services <br />adorman@orangecountync.gov <br />acooper@orangecountync.gov <br /> <br /> <br />JOB <br />Motor Pool Renovations <br /> <br />ITEM # DESCRIPTION QUANTITY <br /> <br />Provide and Install 3 5/8” metal studs, 5/8” drywall (hang & finish), paint wall, <br />install vinyl base for new walls (approx. 50 linear feet), 8’ high (to bottom of <br />existing ceiling and install (3) new 3’ x 7’ solid core wood door and frame. <br />Includes new wall and door in Hallway & new “pass-thru” window in Office <br /> <br /> Infill existing masonry opening (approx. 26’ x 4’-4”) with 3 5/8” metal studs, <br />5/8” drywall (hang & finish), paint wall & install 16’ of “ped board” <br /> Replace the existing Ceiling Tiles (existing ceiling grid to remain) <br /> Rework existing HVAC as needed <br /> Rework existing Light Fixtures as needed <br /> Provide and install new quad receptacle in new Office area <br /> Provide and install new exit light over new door in Hall <br /> Remove existing “Pass-thru” window, infill masonry opening with 3 5/8” metal studs, <br />5/8” drywall and cork board. <br /> Total >>>>>> $35,950.00 <br /> <br />Thank you for your business! <br /> PROPOSAL <br />DocuSign Envelope ID: 8FFCAA73-ED0E-40BC-8F61-606FF71D1D45
The URL can be used to link to this page
Your browser does not support the video tag.