Orange County NC Website
Key Points <br /> • Staff is currently reviewing 6 applications for the Master Design Services contract. <br /> • Staff does not yet know the cost associated with the Master Plan Design Services. <br /> • The MMC will decide on funding for the Master Plan at a later point. <br /> The meeting adjourned at 5:05 pm. <br />