Orange County NC Website
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
16 <br /> Meeting Summary <br /> This meeting addressed three topics: <br /> 1. Update: Inman Property <br /> 2. Master Plan - Draft Scope of Work <br /> 3. Update: Recombination Plat and Deed <br /> Details per Topic Area <br /> 1. Inman Property: Moving forward with the Environmental Assessment? <br /> Key points <br /> • Environmental Assessment Phase 1 will likely be a couple of thousands of dollars, and take a <br /> week. <br /> • Judy Johnson will work with counterparts to work through scope, make edits as needed <br /> and get underway. <br /> Decision for this area <br /> => Move forward with the consideration of the proposal for the Environmental Assessment. <br /> 2. Master Plan - Draft Scope of Work Presentation here Draft Scope of Work here <br /> The group evaluated whether to release an RFP for a consultant to draft a Master Plan for <br /> the 45 acres identified for future development and connectivity. Ashley Moncado gave the <br /> presentation and emphasized the components of the scope of work would be shaped by the <br /> discussion. Ms. Moncado presented three possible options for the scope of work: <br /> Greene Tract Master ' Draft Scope of Work <br /> Project Coordination and Project Coordination and Project Coordination and <br /> Management Management Management <br /> Research and Analysis Research and Analysis Research and Analysis <br /> Community Engagement Community Engagement Community Engagement <br /> Master Plan(including Connectivity <br /> Connectivity Plan <br /> Master Plan(including Connectivity Plan) <br /> Plan) <br /> School and Recreational Site Analysis <br />