Browse
Search
2023-539-E-Solid Waste-Draper Aden Associates-Ferguson and Bradshaw Quarry W&R site consolidation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-539-E-Solid Waste-Draper Aden Associates-Ferguson and Bradshaw Quarry W&R site consolidation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 2:31:45 PM
Creation date
10/5/2023 2:31:40 PM
Metadata
Fields
Template:
Contract
Date
10/3/2023
Contract Starting Date
10/3/2023
Contract Ending Date
10/3/2023
Contract Document Type
Contract
Amount
$26,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robert Williams <br />September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2 <br />Page 5 of 6 <br /> <br />· Traffic counts <br />· Traffic impact analyses and/or signal warrant analyses <br />· Driveway permits/right-of-way encroachments <br />· Off-site roadway design/traffic signal design <br /> <br />Information Provided By Client: The following information shall be provided by the Client: <br />· Specific information regarding on-site operations <br />· Proposed development plan, including land uses and intensities as well as site access <br />· Proposed build-out year. <br />We shall be entitled to rely on the completeness and accuracy of all information provided by the <br />Client. <br />FEES: These lump sum fees will be invoiced monthly based on our estimation of the percentage <br />complete on each task. Time and material (T&M) fees will be based upon current 2023/2024 bill rates. <br />1. Survey Services ................................................................................................................................. $ 6,500 <br />2. Environmental Sampling .......................................................................................................... $13,500 (T&M) <br />3. Preliminary Traffic Investigation .............................................................................................. $6,000 (T&M) <br />TOTAL .............................................................................................................. $26,000* <br /> (Note: allowances for reimbursable costs (mileage, printing) are included). Total is a budget estimate, <br />based on time and material tasks. TRC will request written approval prior to exceeding the time and <br />material estimates. <br /> <br />TERMS AND CONDITIONS: The proposed services will be provided in accordance with the <br />conditions presented herein and an existing agreement between Draper Aden Associates and Orange <br />County Solid Waste Management. <br /> <br /> <br />Sincerely, <br /> <br /> <br />C. Tyrus Clayton, PE <br />Regional Growth Leader <br /> <br /> <br />cc: Bruce Woody (OCSWM) <br />Cheryl Young (OCSWM) <br />Ian Spurlock (DAA/TRC) <br /> <br />DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
The URL can be used to link to this page
Your browser does not support the video tag.