Browse
Search
2023-539-E-Solid Waste-Draper Aden Associates-Ferguson and Bradshaw Quarry W&R site consolidation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-539-E-Solid Waste-Draper Aden Associates-Ferguson and Bradshaw Quarry W&R site consolidation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 2:31:45 PM
Creation date
10/5/2023 2:31:40 PM
Metadata
Fields
Template:
Contract
Date
10/3/2023
Contract Starting Date
10/3/2023
Contract Ending Date
10/3/2023
Contract Document Type
Contract
Amount
$26,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robert Williams <br />September 28, 2023 – Orange Grove Rd W&R Center – Supplemental Tasks #2 <br />Page 4 of 6 <br /> <br />Approximate Boring/Sampling Locations <br /> <br /> <br />Task 3 – Preliminary Traffic Investigation & TIA Scoping: DAA/TRC’s subconsultant, Kimley-Horn, will <br />consult with the project team regarding site access and circulation and the type of type of operations <br />anticipated on the site. At this point, we anticipate that trip generation for the proposed site will be <br />determined by available data for two existing recycling sites that will be consolidated at the subject <br />site. We will review data to determine average weekday and weekend daily and peak hour rates. <br /> <br />We will obtain readily available average daily traffic count data from NCDOT. Based on this <br />information, we will investigate historical traffic growth rates for relevant roadway segments. We will <br />also research readily available public data related to funded transportation projects and <br />pending/approved developments in the project vicinity. <br /> <br />With this information, we will coordinate and attend one meeting with NCDOT and the Orange <br />County Staff to discuss and finalize the scope and parameters of the proposed study. Based on these <br />discussions, we will prepare a memorandum of understanding summarizing the analysis assumptions <br />for the TIA for review by the County and NCDOT. <br /> <br />Future Task – Traffic Impact Analysis: As the study area and assumptions of this analysis will be based <br />on the findings of Task 3 above, the scope and fee for the Traffic Impact Analysis will be quoted once <br />Task 3 is completed. <br /> <br />Additional Services: Any services not specifically provided for in the above scope, as well as any <br />additional scope the Client requests, will be considered additional services and will be performed at <br />our then current hourly rates. Additional services we can provide include, but are not limited to, the <br />following: <br />DocuSign Envelope ID: BB84C0E6-F492-4E59-8BE1-7BCC7B770892
The URL can be used to link to this page
Your browser does not support the video tag.