Browse
Search
Agenda 10-03-23; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 10-03-2023 Business Meeting
>
Agenda 10-03-23; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 1:05:04 PM
Creation date
9/28/2023 10:51:54 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for October 3, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 10-03-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> 1 Slide#17 <br /> p,N Q S 7',q,q <br /> GPM N, ENVNRONMIFTF <br /> IMMUN 0 AMP <br /> CONSERVATIOdt <br /> Ilk e� <br /> 2 <br /> 3 Commissioner Hamilton said it would be helpful for her to talk about Scopes 1, 2, and 3. <br /> 4 Kristen Cushman said scope 3 is the electricity that is purchased. She said that scopes 1 <br /> 5 and 2 are natural gas and fleet. She said moving into the community space is scope 3. <br /> 6 Commissioner Greene said some of categories in scope 3 are in the Board's control to a <br /> 7 certain extent through land use planning. <br /> 8 <br /> 9 Slide #18 <br /> TOP so THINGS THE COUNTY CAN DO <br /> 1 Decrease vehicle miles traveled NMTf3a%fromaHaigbaseline byzv50(currentlyat <br /> 1.371,849.587 tram Google Environmental knslghts Exploreo <br /> 2 Increase community EV adoption rates 50%by 2435 using a 2023 baseline per EO 248 and <br /> 100%by 2056{currently at 12%1 <br /> 3. Achieve50%emission reduction target by 2030 and wo%by 2a5o using a 2005 baseline <br /> 4. Achleve 100%clean renewable energy by 2o5o In mun lcl pal and commun lty Sectors <br /> 5. tncreasethe%ofcommunitywldesotarby20%by2035 <br /> i?i.Gompletean el-ectrificatianstudy and establish a long-term implementation plan(Phase i <br /> and Phase 2)for both mun ici pal and commun ity i nfrastructure by 2625 <br /> 7. Expand County funding to Includecllmate expenditures and addltlonalfutl tlrne <br /> sustainability staff <br /> 8 integrate sustalnabllltyasaframeworkwlthlnthe overallCounty'splanningprocess <br /> 9.Identify and prioritize actionstargeted to vulnerable populations within the County <br /> 18.Be prepared for climate change <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.