Browse
Search
2023-511-E-AMS-Siemens Industry-Northern Campus - Fire Alarm System Adjustments per Fire marshal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-511-E-AMS-Siemens Industry-Northern Campus - Fire Alarm System Adjustments per Fire marshal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 2:10:52 PM
Creation date
9/20/2023 2:10:33 PM
Metadata
Fields
Template:
Contract
Date
9/8/2023
Contract Starting Date
9/8/2023
Contract Ending Date
9/19/2023
Contract Document Type
Contract
Amount
$17,890.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications <br />1.Siemens will provide the fire alarm permit, review and inspection fees. <br />2.Siemens will need to be provided with architectural backgrounds in Auto CAD files, <br />3.Owner will need to allow Siemens full and complete access to the property in secure areas by provided <br />escort for the duration of the project. <br />4.Project will be performed under one phase and will need to have the Owner's schedule, input and <br />cooperation to complete work during the allotted time. <br />5.Submittals may take between 4-6 weeks for approval through the Fire Department. <br />6.All work to be performed during normal working hours of Monday thru Friday, 6:00am to 4:00pm. <br />7.If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided <br />Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of <br />equipment used, and a detailed input/output matrix or sequence of operations.In the event that such <br />information is provided post-award or such information is discovered by Siemens during installation of <br />the scope, a change order for additional time and an increase in cost may be required due to the <br />information differing from assumptions that Siemens had to make in developing the scope. <br />Page 7 of 12 <br />DocuSign Envelope ID: FAD78E55-CF0F-4C9E-9469-4E8CA02FCECD
The URL can be used to link to this page
Your browser does not support the video tag.