Orange County NC Website
Exclusions <br />1.Offsite system monitoring fees <br />2.Cost associated with multiple trips to the job site due to incompletion by others <br />3.Working in areas containing hazardous materials or confined space <br />4.Cost associated with schedule acceleration or multiple unplanned phases <br />5.Telephone line for DACT and/or IP Network Connection <br />6.Costs associated with bypassing the system during construction <br />7.Building and construction permit fees <br />8.Creating base building auto cad drawings for the project <br />9.Ceiling and/or wall removal, replacement, patching, and painting <br />10.Per project aggregate general liability insurance <br />11.Overtime <br />12.After hours work <br />13.Additional testing due to others <br />14.120 VAC power <br />15.Conduit raceway, Electrical boxes and supports <br />16.Performance or payment bonds <br />17.Bonding or special insurance <br />18.Fire caulking <br />19.Scaffolding and lifts (except as specifically noted) <br />20.Knox box <br />21.Shunt trip breakers <br />22.Security system interface or door lock release <br />23.Wall / Ceiling penetrations <br />24.UPS Power to FAC and network switch <br />25.DOL inspections <br />26.Fire Watch <br />27.Proposal excludes sales tax. Sales tax will be included on the invoice unless Siemens receives a <br />completed NCDOR E589CI (North Carolina Affidavit of Capital Expenditures).We have included an <br />NCDOR E589CI form with this proposal for your convenience. <br />Page 6 of 12 <br />DocuSign Envelope ID: FAD78E55-CF0F-4C9E-9469-4E8CA02FCECD