Browse
Search
2023-509-E-AMS-ProNet Systems-Waterstone - Security Camera System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-509-E-AMS-ProNet Systems-Waterstone - Security Camera System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 2:09:12 PM
Creation date
9/20/2023 2:08:57 PM
Metadata
Fields
Template:
Contract
Date
9/14/2023
Contract Starting Date
9/14/2023
Contract Ending Date
9/20/2023
Contract Document Type
Contract
Amount
$11,552.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 04/23 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE Waterstone Camera <br /> FY 2023-2024 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 20th <br />day of September, 2023, by and between ProNet Systems, Inc., (hereinafter called the “Contractor”), and <br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by N/A (Sheet dated ) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. ProNet Systems, Inc. proposal dated June 7, 2023 which fully describes the work to be <br />performed. Such work will hereafter be called the “Work”. <br /> <br />d. Related documents listed under Section 1 above. <br /> <br />3. TERM AND SCHEDULING <br />a. The Contractor agrees to commence work pursuant to the written Notice to Proceed. <br /> <br />b. The Contractor agrees to complete substantially all Work by June 30, 2024. <br />DocuSign Envelope ID: AC97B7EF-FB81-4E91-977E-1CC86EB4AEE6
The URL can be used to link to this page
Your browser does not support the video tag.