Orange County NC Website
18 Orange County Comprehensive Land Use Plan <br />Project Schedule <br />The Comprehensive Plan will be developed using the following project schedule. <br /> <br />*Two addi�onal Board of Commissioner mee�ngs can be added as needed to this schedule. <br />*Up to two public hearings can be conducted in Phase 5 (with Planning Board and/or Board of <br />Commissioners). <br /> <br /> <br /> <br />DocuSign Envelope ID: 3C4C0744-8A68-4BE3-8967-7FABC6CFA5A1