Browse
Search
2023-502-Planning Dept-Clarion Associates- Develop a Comprehensive Land Use Plan
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-502-Planning Dept-Clarion Associates- Develop a Comprehensive Land Use Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 2:04:14 PM
Creation date
9/20/2023 2:04:00 PM
Metadata
Fields
Template:
Contract
Date
9/11/2023
Contract Starting Date
9/11/2023
Contract Ending Date
9/18/2023
Contract Document Type
Contract
Amount
$211,954.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 Orange County Comprehensive Land Use Plan <br />policy. These analyses will consider the equity opportunity areas (Task 3.1.1), which can be used as an <br />overlay upon environmentally sensi�ve areas and iden�fy cri�cal areas for focusing policy efforts. <br /> <br />Task 3.1.4: Iden�fy Climate-related Vulnerabili�es and Natural Hazards <br />Equinox will leverage the Orange County Climate Ac�on Plan and the Eno-Haw Regional Hazard Mi�ga�on <br />Plan to iden�fy key acute and chronic climate-related vulnerabili�es within the County. This includes <br />vulnerabili�es to property, homes, emergency service facili�es, hospitals, roads and transporta�on, and <br />community services. Near term, mid-term, and long-term poten�al climate changes using the NOAA <br />Climate Explorer Tool will be summarized. The results of the most recent Eno-Haw Regional Hazard <br />Mi�ga�on Plan’s cri�cal facili�es and loss es�ma�ons will be incorporated into this analysis. This will be <br />accomplished by pinpoin�ng cri�cal assets in the County and their vulnerabili�es to threats from climate <br />change. It is important to iden�fy indirect impacts as well, such as impacts due to interrup�on or loss of <br />services. These causes and indicators will be assessed and documented. <br /> <br />Task 3.1.5: Summarize Transporta�on Planning, Condi�ons, and Trends <br />The Clarion team will prepare a summary of relevant data and informa�on pertaining to the County’s <br />current and future transporta�on system. This effort will leverage transporta�on planning of the Triangle <br />Area Rural Planning Organiza�on (TARPO), Burlington-Graham Metropolitan Planning Organiza�on <br />(BGMPO), and the Durham-Chapel Hill Metropolitan Planning Organiza�on (DHCH MPO) planning efforts. <br />The team will review exis�ng plans, policies, and projects related to transporta�on, including the recently <br />completed 2022 Orange County Transit Plan. <br /> <br />Task 3.1.6: Evaluate Public Facili�es and Services Condi�ons, and Trends <br />The Clarion Team will prepare an assessment of exis�ng public facili�es and services provided by the <br />County and partners (Orange County Schools and par�cipa�ng u�li�es). At a minimum, these services and <br />facili�es will include public u�li�es, solid waste, public safety (Sheriff, fire, EMS), emergency management, <br />and libraries. This assessment will document exis�ng facili�es and services, capaci�es, and any plans for <br />enhancing or increasing levels of service. This will also include a mapped assessment of where facili�es <br />exist in rela�onship to the equity opportunity areas iden�fied in Task 3.1.1 and make ini�al <br />recommenda�ons for future facili�es and services needs to improve access to underserved popula�ons. <br />Finally, this assessment will determine whether exis�ng facili�es and services are expected to adequately <br />support projected future growth. <br /> <br />Task 3.2: Staff Working Group Mee�ng #6 (In-Person) <br />The Clarion team will facilitate a sixth in-person mee�ng of the Staff Working Group to present the Fact <br />Book findings and iden�fy related policy ques�ons. <br /> <br />Summary of Phase 3: Evaluate Planning Influences <br />Deliverables: <br />Clarion Team Responsibilities County Staff Responsibilities <br />• Materials for Staff Working Group meetings <br />• Fact Book <br />• Update project website <br />• Prepare GIS analysis and maps for Fact Book <br />• Review and provide consolidated comments <br />on Fact Book <br />• Review and provide consolidated comments <br />on meeting materials <br />DocuSign Envelope ID: 3C4C0744-8A68-4BE3-8967-7FABC6CFA5A1
The URL can be used to link to this page
Your browser does not support the video tag.