Browse
Search
2023-487-E-AMS-southern air-Preventive Boiler Maintenance Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-487-E-AMS-southern air-Preventive Boiler Maintenance Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 1:51:57 PM
Creation date
9/20/2023 1:51:45 PM
Metadata
Fields
Template:
Contract
Date
9/4/2023
Contract Starting Date
9/4/2023
Contract Ending Date
9/8/2023
Contract Document Type
Contract
Amount
$5,510.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
License Numbers: VA 2701001733 • WV 001545 • NC L.34582 & U.33082 <br /> K. Clean program timer contacts, and inspect all control wiring and terminals, tighten as required. <br /> L. Check for leaks on all gas valves and pressure regulators. (Gas fired only.) <br /> M. Check all vent lines for connection and obstruction. (Gas fired only.) <br /> N. Clean and inspect burner tube and fire cone. (Gas fired only.) <br /> O. Flush sediment from make-up water feed control. <br /> P. Check and adjust low water cut-off control. <br /> <br /> 2. SEASONAL START-UP – (May be performed concurrently with Annual Maintenance.) <br /> <br /> A. Re-fire boiler per manufacturers recommendations. <br /> B. Verify correct operation of gas valves. (Gas fired only.) <br /> C. Test gas pressure at burner, check and adjust burner and pilot pressure regulators as required. (Gas fired <br />only.) <br /> D. Test all safety and operating controls, calibrate as required. <br /> E. Test flame failure control for positive shut-off upon loss of flame. <br /> F. Test water pressure safety/relief valve for correct relief setting and positive seal. <br /> G. Observe burner flame through entire range of modulation from low fire to high fire. <br /> H. Perform smoke spot efficiency test and adjust fuel pressure or volume regulating valve cam as required. <br />Test to be performed at low fire, mid fire, high fire. Adjust combustion air dampers as required. <br /> I. Confirm smooth full range operation of burner modulation motor and associated components. <br /> J. Test and adjust stack draft per manufacturers recommendations. <br />Page 6 of 12 <br />DocuSign Envelope ID: 150F5FF0-7BF2-4B98-90F6-34A8158BF405
The URL can be used to link to this page
Your browser does not support the video tag.