Browse
Search
2023-486-E-AMS-southern air-Prevenive Maintenance Agreement- Whitted Buildingt
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-486-E-AMS-southern air-Prevenive Maintenance Agreement- Whitted Buildingt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 1:51:19 PM
Creation date
9/20/2023 1:51:07 PM
Metadata
Fields
Template:
Contract
Date
9/1/2023
Contract Starting Date
9/1/2023
Contract Ending Date
9/8/2023
Contract Document Type
Contract
Amount
$2,080.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
License Numbers: VA 2701001733 • WV 001545 • NC L.34582 & U.33082 <br /> M. Review all service and operating alarms stored in memory of control panel. <br /> N. Check condition and cleanliness of condenser fan blades, motors, and coils (air cooled only.) <br /> <br /> 2. SEASONAL START-UP – May be performed concurrently with Annual Maintenance, or at a later <br />date mutually agreed upon between Southern Air and equipment owner. <br /> <br /> A. Start machine per manufacturer’s recommendations. <br /> B. Verify condition and correct operation of all flow switches, differential pressure switches, or other <br />external interlock safety controls. <br /> C. Check and record all operating voltages and amperages. <br /> D. Verify correct oil and refrigerant charges. Verify correct operating oil pressure. <br /> E. Verify design water flow and pressure drop across evaporator. Verify correct fan rotation, motor <br />voltage, current draw, and design airflow across condenser coil. (Air-cooled only). <br /> <br /> F. Verify proper calibration and control of all safety and operating devises. <br /> G. Verify correct programming and operating parameters of chiller control panel. <br /> H. Verify and adjust as required for design superheat and subcooling. <br /> I. Present copy of start-up log to owner with detailed explanation of findings. <br /> <br /> 3. OPERATING MAINTENANCE AND INSPECTION – <br /> <br /> A. Observe operation of chiller. <br /> B. Review all service and operating alarms stored in memory of custom reports menu. (Where <br />available.) <br />Page 4 of 11 <br />DocuSign Envelope ID: F276DE55-1B05-417C-9C6E-426AF3151AE4
The URL can be used to link to this page
Your browser does not support the video tag.