Browse
Search
Agenda 09-19-23; 8-c - Orange County Transportation Priorities – Amended Resolution
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 09-19-2023 Business Meeting
>
Agenda 09-19-23; 8-c - Orange County Transportation Priorities – Amended Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:37:02 AM
Creation date
9/14/2023 11:41:37 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-c
Document Relationships
Agenda for September 19, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 09-19-2023 Business Meeting
Minutes-09-19-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-061-Sidewalk maintenance agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-063-FY 2024 Local share certification for funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-064-Unified grant application FY 2025 Local share certification for funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-058-Public transporation program resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-059-Orange County Transportation Priorities – Amended Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 4) Dairyland Road Improvements: Modernize Dairyland Road (SR-1177) from Orange Grove <br /> Road (SR-1006) to Old NC-86 (SR-1009) with NCDOT standard street cross-section 2B (60' <br /> row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at <br /> Orange Grove Road (SR-1006), Dodson Crossroads (SR-1102), Rocky Ridge Road (SR- <br /> 1113), Bethel Hickory Grove Church Road (SR-1104) and convert intersection at Old NC-86 <br /> (SR-1009) to Roundabout. <br /> 5) Dodsons Crossroads Improvements: Modernize Dodson Crossroad (SR-1102) from Orange <br /> Grove Road (SR-1006) to NC-54 with NCDOT standard street cross-section 2B (60' row, 11' <br /> travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Orange <br /> Grove Road (SR-1106), Borland Road (SR-1126), Arthur Minnis Road (SR-1115), and <br /> Dairyland Road (SR-1177). <br /> 6) Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to <br /> 1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved <br /> shoulder), add turn lanes and safety improvements at Old Hillsborough Road Road (SR- <br /> 2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church <br /> Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR- <br /> 1119), Bradshaw Quarry Road (SR-1100), and NC-54. <br /> 7) Old NC-86 Improvements: Modernize Old NC-86 (SR-1009) from 1-40 to Eubanks Road (SR- <br /> 1727) with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved <br /> shoulder), add turn lanes at Davis Road (SR-1129), and New Hope Church Road (SR-1723). <br /> 8) NC 86 Improvements - Widen from NC-57 to Caswell County Line with additional lanes and <br /> multimodal facilities along the corridor and safety improvements at each intersection <br /> 9) NC-54 Improvements: Widen NC-54 from Mebane Oaks Road (SR-1007) to Orange Grove <br /> Road (SR-1006) and Orange Grove Rd (SR 1006) to Butler Rd (SR 1951) / Dodsons Cross Rd <br /> (SR 1102) and from Butler Rd (SR 1951) / Dodsons Cross Rd (SR 1102) to Old Fayetteville <br /> Road (SR-1107) / Inside DCHC with additional lanes and multimodal facilities along the <br /> corridor and safety improvements at each intersection. <br /> Durham-Chapel Hill-Carrboro MPO: <br /> 1) US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR- <br /> 1114) to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' <br /> median, 11' travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety <br /> improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), <br /> Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette <br /> Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove <br /> Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR- <br /> 1588), and N Scotswood Boulevard (SR-2300). <br /> 2) 1-85/NC 86 Interchange Improvements: Reconstruct interchange at 1-85 and NC 86. <br /> 3) NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC <br /> 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. <br /> 4) Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno <br /> Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) <br /> and make safety improvements. <br /> 5) U.S. 70 East/1-85/1-40 Connector: Modify the 1-85/1-40 Connector (SR 1239) interchange at <br /> U.S. 70 to provide access from all directions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.