6
<br /> Burlington-Graham MPO:
<br /> 1) US-70 Improvements: Widen US-70 and improve intersections from Buckhorn Road (SR-
<br /> 1114) to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5'
<br /> median, 11' travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety
<br /> improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004),
<br /> Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette
<br /> Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove
<br /> Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-
<br /> 1588), and N Scotswood Boulevard (SR-2300).
<br /> 2) Mattress Factory Road Interchange: Construct a new interchange at the existing grade-
<br /> separated crossing of Mattress Factory Road and 1-85/1-40.
<br /> 3) Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across
<br /> East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S.
<br /> 70 and close the existing railroad crossover road connecting East Washington Street and U.S.
<br /> 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East
<br /> Washington Street.
<br /> 4) Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road
<br /> (SR1144) to multiple lanes with bicycle and pedestrian facilities with grade separation
<br /> connection at US-70.
<br /> 5) Lebanon Road Improvements: Intersection and safety improvements along Lebanon Road
<br /> (SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004).
<br /> 6) Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to
<br /> 1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved
<br /> shoulder), add turn lanes and safety improvements at Old Hillsborough Road Road (SR-
<br /> 2126), Hebron Church Road (SR-1139), Yarborough Road (SR-1138), Oak Grove Church
<br /> Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR-
<br /> 1119), Bradshaw Quarry Road (SR-1100), and NC-54.
<br /> Triangle Area RPO:
<br /> 1) Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) from
<br /> Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section
<br /> 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety improvements
<br /> at Jones Ferry Road (SR-1942), Hatch Road (SR-1944), Neville Road (SR-1945), Carl
<br /> Durham Road (SR-1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and
<br /> Orange Chapel Clover Garden Road (SR-1956).
<br /> 2) Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from
<br /> Highland Farm Road (SR 1332) to Carr Store Road (SR 1352) with NCDOT standard street
<br /> cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder), add turn lanes and safety
<br /> improvements at Carr Street (SR-1357) and highland Farm Road (SR-1332)
<br /> 3) Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to
<br /> Dodson Crossroad (SR-1007) with NCDOT standard street cross-section 2B (60' row, 11'
<br /> travel lanes, with 5' paved shoulder), add turn lanes and safety improvements at Ode Turner
<br /> Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-
<br /> 1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102)
<br />
|