Browse
Search
Agenda 09-19-23; 6-a - Orange County NC 54 Multimodal Corridor Study
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 09-19-2023 Business Meeting
>
Agenda 09-19-23; 6-a - Orange County NC 54 Multimodal Corridor Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:36:44 AM
Creation date
9/14/2023 11:41:36 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 19, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 09-19-2023 Business Meeting
Minutes-09-19-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-061-Sidewalk maintenance agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-063-FY 2024 Local share certification for funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-064-Unified grant application FY 2025 Local share certification for funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-058-Public transporation program resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-059-Orange County Transportation Priorities – Amended Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
}` MPO Board 2019 Item 8 <br /> r <br /> Daily Vehicle-Trip Distribution (StreetLi ht InSi h % �,-r <br /> Teel�� <br /> I <br /> G' <br /> Uairyland-Rd <br /> _ <br /> Ioa o <br /> 5d 2% ` , <1%- 2°� a 100% <br /> _2% <br /> 2` <br /> h �� <br /> r <br /> ti�,� "art <br /> •CYId Greensboro-PW Average Mon-Thu for Apr, May,Sep,&Oct,2016-18 <br /> m� <br /> Totals may not add up precisely due to rounding <br /> • Blue%s represent trips to/from intersecting roads <br /> Red%s represent trips to/from minor roads and <br /> driveways along a segment of NC 54 <br /> fir• <br /> Page 8 of 25 <br /> �� <br /> Figure 8: Origin-Destination Analysis — West Main St East of NC 54 Bypass <br /> 0 0.3 0.6 1.2 Miles <br />
The URL can be used to link to this page
Your browser does not support the video tag.