Attachment 2. Planning Department Fee Schedule Revisions 13
<br /> Special Use Permits $560.00 staff review fee,$30.00 signposting, $560.00 staff review fee,$30.00 sign posting 2021 Clarify fee language regarding sign posting
<br /> $1.00 first class mail fee for each individual fee per sign per posting event,$1.00 first and mailing fees
<br /> parcel required to be notified of request(i.e. class mail fee applied per parcel per mailing
<br /> neighborhood meeting and public hearing) event.
<br /> Major Subdivision (Under 20 proposed lots and
<br /> not involving a Conditional District application)
<br /> Concept Plan $310 staff review fee,$30.00 sign posting, $310 staff review fee,$30.00 sign posting fee 2023 Clarify fee language regarding sign posting
<br /> $1.00 Neighborhood Information meeting per sign per posting event,$1.00 first class and mailing fees
<br /> mailing fee,applied per mailing event(FLUM mail fee applied per parcel per mailing event.
<br /> Change, Zoning Atlas Amendment,Special Use
<br /> Permit,Board of Adjustment Variances,Major
<br /> Subdivision Concept Plan,Vacation of r/w,
<br /> Partial Width r/w)
<br /> Preliminary $600.00 staff review fee,$2,000.00 legal $600.00 staff review fee,$2,000.00 legal 2023 Clarify fee language regarding sign posting
<br /> advertisement(i.w.newspaper ads),$30 advertisement,$30.00 sign posting fee per sign and mailing fees
<br /> (sign)/$1.00(mailing) per posting event,$1.00 first class mail fee
<br /> applied per pare el per mailing event.
<br /> Modification of approved subdivision $500.00 staff review fee,$2,000.00 legal $500.00 staff review fee,$2,000.00 legal 2023 Clarify fee language regarding sign posting
<br /> preliminary or final plat advertisement(i.e.newspaper ads)$30 advertisement,$30.00 sign posting fee per sign and mailing fees
<br /> (sign)/$1.00(mailing) per posting event,$1.00 first class mail fee
<br /> applied per parcel per mailing event.
<br /> Nonresidential uses $1,000.00 staff review fee plus,$20.00 per 100 $1,000.00 staff review fee plus,$20.00 per 1000 2021 Address clerical error from 2016-17 fee
<br /> square feet of proposed office/institutional square feet of proposed office/institutional schedule
<br /> building area,$25.00 per 100 square feet of building area,$25.00 per 1000 square feet of
<br /> industrial/warehouse building area,$30.00 per industrial/warehouse building area,$30.00 per
<br /> 100 square foot of proposed commercial/retail 1000 square foot of proposed commercial/retail
<br /> building area. If project is associated with a building area. If project is associated with a
<br /> Conditional District approval,an additional Conditional District approval,an additional
<br /> $250.00 staff review shall apply to the project $250.00 staffreview shall apply to the project.
<br /> Sign posting fee per sign per posting event(FLUM $25+$2/sq.ft. Sign permit application 2001 Clarify fee title
<br /> Change,Zoning Atlas Map Amendments,Special Use
<br /> Permits,Board of Adjustment Variances,Major
<br /> Subdivision Concept Plans,Vacation of r/w,Partial
<br /> Width r/w request)
<br /> Private Road Right-of-way request $125.00 staff review fee,$2,000.00 legal $125.00 staff review fee,$2,000.00 legal 2023 Clarify fee language regarding sign posting
<br /> advertisement to match all legal advertising advertisement,$30.00 sign posting fee per sign and mailing fees
<br /> across fee schedule,$30.00 sign posting,$5.00 per posting event,$5.00 certified mailing fee
<br /> certified mailing fee for each individual parcel applied per parcel per mailing event.
<br /> required to be notified of request
<br /> Abandonment of rights-of-way/release of easements $250.00 staff review fee,$2000.00 legal $250.00 staff review fee,$2000.00 legal 2023 Clarify fee language regarding sign posting
<br /> per abandonment or release(includes advertising) advertisement,$30.00 sign posting,$5.00 advertisement,$30.00 sign posting fee per sign and mailing fees
<br /> certified mailing fee,applied per mailing event per posting event,$5.00 certified mailing fee
<br /> (FLUM Change, Zoning Atlas Amendment, applied per parcel per mailing event.
<br /> Special Use Permit,Board of Adjustment
<br /> Variances,Major Subdivision Concept Plan,
<br /> Vacation of r/w,Partial Width r/w)
<br />
|