Browse
Search
2023-470-E-AMS-Turner Asphalt-Sportsplex parking lot resurfacing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-470-E-AMS-Turner Asphalt-Sportsplex parking lot resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 2:20:31 PM
Creation date
8/30/2023 2:18:01 PM
Metadata
Fields
Template:
Contract
Date
8/25/2023
Contract Starting Date
8/25/2023
Contract Ending Date
8/28/2023
Contract Document Type
Contract
Amount
$240,465.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Provisions <br />PATCHING EXISTING PAVEMENT: <br />DESCRIPTION <br />The Contractor's attention is directed to the fact that there are areas of existing pavement on this <br />project that will require repair prior to resurfacing. Patch the areas that, in the opinion of the <br />Engineer, need repairing. The areas to be patched will be delineated by the Engineer prior to the <br />Contractor performing repairs. The Contractor will be required to use a milling machine <br />suitable to performing a minimum patch of 4 ft in width when patching on all maps. <br />MATERIALS <br />Intermediate Course. <br />CONSTRUCTION METHODS <br />Remove existing pavement at locations directed by the Engineer in accordance with Section 250 <br />of the 2018 Standard Specifications. <br />Place Asphalt Concrete Intermediate Course, in lifts not exceeding 4.0 inches. Utilize <br />compaction equipment suitable for compacting patches as small as 4 feet by 6 feet on each lift. <br />Use an approved compaction pattern to achieve proper compaction. Schedule operations so that <br />all areas where pavement has been removed will be repaired on the same day of the pavement <br />removal and all lanes of traffic restored. <br />MEASUREMENT AND PAYMENT <br /> Patching Existing Pavement will be measured and paid as the actual number of tons of asphalt <br />plant mix complete in place that has been used to make completed and accepted repairs. The <br />asphalt plant mixed material will be measured by being weighed in trucks on certified platform <br />scales or other certified weighing devices. The above price and payment will be full <br />compensation for all work covered by this provision, including but not limited to removal and <br />disposal of all types of pavement; furnishing and applying tack coat; furnishing, placing, and <br />compacting of asphalt plant mix; furnishing of asphalt binder for the asphalt plant mix; and <br />furnishing scales. <br />Patching Existing Pavement will be considered a minor item. Any provisions included in the <br />contract that provides for adjustments in compensation due to variations in the price of asphalt <br />binder will not be applicable to payment for the work covered by this provision. <br />Payment will be made under: <br />Pay Item Pay Unit <br />Patching Existing Pavement Ton <br />103 <br />DocuSign Envelope ID: 797C32F6-C1CE-44EB-BF17-813A5939396C
The URL can be used to link to this page
Your browser does not support the video tag.