Browse
Search
2023-470-E-AMS-Turner Asphalt-Sportsplex parking lot resurfacing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-470-E-AMS-Turner Asphalt-Sportsplex parking lot resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 2:20:31 PM
Creation date
8/30/2023 2:18:01 PM
Metadata
Fields
Template:
Contract
Date
8/25/2023
Contract Starting Date
8/25/2023
Contract Ending Date
8/28/2023
Contract Document Type
Contract
Amount
$240,465.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Provisions <br />GENERAL <br />This contract is for resurfacing of the following Parking Lot: Orange County Sportsplex.. <br />All work and materials shall be in accordance with the provisions of the General <br />Guidelines of this contract, the Project Special Provisions, the North Carolina <br />Department of Transportation NCDOT Standard Specifications for Roads and Structures <br />2012, the North Carolina Department of Transportation Roadway Standard Drawings, <br />and the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). <br />The Contractor shall keep themself fully informed of all Federal, State and local laws, <br />ordinances, and regulations, and shall comply with the provisions of Section 107 of the <br />NCDOT Standard Specifications. <br />CONTRACT TIME AND LIQUIDATED DAMAGES <br />The date of availability for this project will be the Date of the Notice to Proceed. <br />The Contractor may begin work prior to this date upon approval of the Engineer or his <br />duly authorized representative. If such approval is given, and the Contractor begins work <br />prior to the date of availability, Orange County will assume no responsibility for any <br />delays caused prior to the date of availability by any reason whatsoever, and such delays, <br />if any, will not constitute a valid reason for extending the completion date. <br />No work will be permitted and no purchase order will be issued until all required bonds <br />and prerequisite conditions and certifications have been satisfied. <br />The completion date for this project is October 31, 2023. No extensions will be <br />authorized except as authorized by Article 108-10 of the NCDOT Standard Specifications <br />Liquidated damages for this contract are ($600.00) per calendar day. <br />100 <br />DocuSign Envelope ID: 797C32F6-C1CE-44EB-BF17-813A5939396C
The URL can be used to link to this page
Your browser does not support the video tag.