Browse
Search
Agenda - 05-21-2002 - 8e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 05-21-2002
>
Agenda - 05-21-2002 - 8e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2017 11:34:50 AM
Creation date
8/29/2008 10:38:56 AM
Metadata
Fields
Template:
BOCC
Date
5/21/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8e
Document Relationships
2002 NS Housing Rehabilitation Contracts Triple J Construction Co
(Supersedes)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2002
Minutes - 20020521
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Catherine Johnson <br /> IN Bon St. <br /> Carbon NC 2]2]8 <br /> 967-9131 <br /> 2128/02 <br /> EXTERIOR: <br /> 1. Rem vn the existing gutter and downspouts. Install aluminum commueus Suter <br /> and downspouts.install rigid,meW leafguards.IaaWl plastic splashblwks under <br /> each downspout. <br /> _. Replacc the broken glass in the living mom. <br /> 3. Install one stoma window. <br /> 4. Prepmetbe exterior wood surtanca for paint Point he extrtlortrim with a<least <br /> two coats of semigloss,exlemr look paint Paint to cover completely. <br /> 5. Replace WC missing hack on the front porn steps.Tnek-poiut the steps. <br /> Roof: <br /> I. Remove the met to the shimming.lnstall 1516. felt aluminum drip edge and dues <br /> tab,fiberglass shingles.Install new plumbing boots. <br /> 1 Flash and counter flash the chimney. <br /> I. Replace opptox. 32 sq.R. of slu aWng. <br /> 4. hour a shingle type edge vent ventilation system. <br /> INTERIOR: <br /> LMNG ROOM: <br /> 1. Remove the existing storm door and enhance door,load a six panel,metal <br /> insulated door unit with weather-supping and ah mimmn threshold.Install a <br /> lockad and deadboltto be keyed the same.Install a wide-angle peephole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.