Browse
Search
Agenda - 05-21-2002 - 8e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 05-21-2002
>
Agenda - 05-21-2002 - 8e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2017 11:34:50 AM
Creation date
8/29/2008 10:38:56 AM
Metadata
Fields
Template:
BOCC
Date
5/21/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8e
Document Relationships
2002 NS Housing Rehabilitation Contracts Triple J Construction Co
(Supersedes)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2002
Minutes - 20020521
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Dorothy Moore <br /> 109 Olossan Circle <br /> Cmrboty <br /> 9291415 <br /> 3/19/02 <br /> _. Remove the existing storm door and door unit.Install a six panel,metal insulated <br /> door unit with alummum threshold and weather-stripping, Install lacked and <br /> demboh to be keyed the same.Install a wide view peephole <br /> 3. Reinstall the existing storm door <br /> 4. Prepare all surface for paint Point the walls with flat latex paint and did Idling <br /> with ceiling white latex paint.Paint me door and trim with semigloss latex paint. <br /> Point to cover completely. <br /> 5. Gem the floor including the diving area.Install/tree coats of gloss latex <br /> polyumNane <br /> Kitchen: <br /> L Prepare the River for vinyl.Install vinyl floor covering.Vinyl to cost not less the <br /> $14 1yd.Install shoemold and asked trim. <br /> _. Install a tolled back carrier tap on bad sink and base cabinets. Reinstall the <br /> double bowl sink and faucet. <br /> 3. Install the following custom-built cabinets: an oven cabinet 24x84 and one <br /> 24'x96'drawer base cabinet,one 12"x36'well cabinet over the mf imblaf and a <br /> 24'x3o"wall cabinet over the stove. <br /> 4. Paint the wells,back and cabinets with semigloss latex paint.Paint the ceiling with <br /> ceiling white latex point. <br /> Laundry Rooms <br /> L Iastall 'Glauan plywood.Prepare the flour for vinyl. <br /> 2. Install vinyl flour covering,shoemold and meted trim. <br />
The URL can be used to link to this page
Your browser does not support the video tag.