Browse
Search
ORD-2023-014-Approval of Professional Services Contract with Woolpert, Inc. to Conduct a Public School Capital Needs Assessment, and Approval of Budget Amendment #7-A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2020-2029
>
2023
>
ORD-2023-014-Approval of Professional Services Contract with Woolpert, Inc. to Conduct a Public School Capital Needs Assessment, and Approval of Budget Amendment #7-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:55:33 PM
Creation date
8/22/2023 2:54:19 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Ordinance
Agenda Item
6-a
Document Relationships
Agenda - 03-21-2023; 6-a - Approval of Professional Services Contract with Woolpert, Inc. to Conduct a Public School Capital Needs Assessment, and Approval of Budget Amendment #7-A
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
Agenda for March 21, 2023 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> • Mechanical: Identify the type of HVAC system and major components, including controls, and <br /> note remaining useful life. This assessment does not include a mechanical capacity study, nor does it <br /> include an assessment of the mechanical system design. <br /> • Plumbing: Determine the type of building plumbing systems including: hot and cold water,gas, <br /> sewer, pneumatic,and mechanical systems. Estimate remaining useful life. <br /> • Fire Protection/Life Safety: Identify any fire protection and life safety systems and provide <br /> estimated remaining useful life <br /> • Structural: Identify any issues related to the structural integrity of the facilities. The assessment <br /> will note significant structural deficiencies and recommend approaches to alleviate. <br /> Integration of the Districts Supplied Facility Condition Data <br /> Data will be collected and structured in the industry-standard Uniformat II system to Uniformat Level V <br /> specifications. In addition to observed facilities deficiency conditions,existing Districts supplied facility condition <br /> data shall be reviewed by the Consultant for incorporation into the Brightly Predictor software for project <br /> packaging and planning.The Districts-supplied data may include any of the following: prior engineering studies, <br /> hazardous materials audits, air or water quality studies,or other related facility condition data. <br /> Deficient Condition <br /> For every deficient condition identified in the audit,a means of correctingthe condition (a correction project)shall <br /> be developed by the Consultant. Each correction project shall entail a detailed description of the methods and <br /> quantities of labor and materials necessary to conduct the work.The estimates shall be based upon R.S.Means <br /> Construction and Facilities Maintenance and Repair Costs data and estimating format. <br /> Each correction project shall be assigned a unique identifier and shall enable correction tracking by the Districts <br /> staff. <br /> Prioritization/Categorization/Classification of Audit Data <br /> Deficiency Priorities <br /> Priority 1 Currently Critical Conditions in this category require immediate action <br /> Priority 2 Potentially Critical Conditions in this category, if not corrected expeditiously,will become critical within a <br /> year. <br /> Priority 3 Necessary - Not yet critical Conditions in this category require appropriate attention to preclude <br /> predictable deterioration or potential downtime and the associated damage or higher costs if deferred further. <br /> Priority 4-Recommended Conditions in this category include items that represent a sensible improvement to existing <br /> conditions.These are not required for the most basic function of the facility;however,Priority 4 projects will improve <br /> overall usability and/or reduce long-term maintenance costs. <br /> Priority 5 Does Not Meet Current Codes/Standards-"Grandfathered"Conditions in this category include items that <br /> do not conform to existing codes, but are "grandfathered" in their condition. No action is required at this time, but <br /> should substantial work be undertaken in contiguous areas,certain existing conditions may require correction. <br /> Deficiency Categories <br /> Each correction project identified shall be assigned as identified in the RFQ. <br /> Deficiency Classification <br /> Each deficiency shall be classified by the major property components identified for survey in the field. For example, <br /> Design and Functionality,Site, Exterior Systems, Interior Systems, Interior Finishes, Health/Fire/Life Safety <br /> Systems, Handicap Accessibility, Heating,Ventilation and Air Conditioning, Plumbing, Electrical and Service <br /> Distribution,Special Electrical Systems, Fire Suppression,Special Construction,or Vertical Transportation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.