Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRIME Form RS-2 FOR USE ON CONTRACT SOLICITATIONS ONLY REV 07/15/2020.RJS(02.21.2023) <br /> NORTH CAROLINA DEPARTMENT OF TRANSPORTATION <br /> PRIME CONSULTANT <br /> TO BE USED WITH PROFESSIONAL SERVICES CONTRACT ONLY <br /> RACE AND GENDER NEUTRAL <br /> Orange County Short Range Transit Plan <br /> TIP No.and/or Type of Work(Limited Services) <br /> Nelson\Nygaard Consulting Associates,Inc. <br /> (Consultant/Firm Name ONLY--Include NO PII(Personally Identifiable Information)) <br /> SERVICE/ITEM DESCRIPTION <br /> Discipline Anticipated <br /> Code* Description Utilization(%) <br /> 410 Multimodal Connectivity Planning 20.00% <br /> 435 Transit Strategy Planning(a notice of change was submitted for this discipline code on 7/25/23) 40.00% <br /> 261 Long Range Transportation Planning 40.00% <br /> **One(1)per line--please use additional Prime RS-2 Forms if necessary. TOTAL UTILIZATION: 100.00% <br /> "PRIME CONSULTANT"(FORM RS-2)RACE AND GENDER NEUTRAL RECOMMENDED BY: <br /> Instructions for completing the Form RS-2: CONSULTANT: <br /> 1. Complete a Prime Consultant Form RS-2 for the prime consultant firm. ^ ff <br /> 2. Insert TIP Number and/or Type of Work(Limited Services) C�IGu� Jennifer Wieland <br /> 3. Complete the Consultant/Firm name for the primary firm information. <br /> 4. Enter Service/Item Description—describe work to be performed by the <br /> Prime Firm <br /> 5. Enter Anticipated Utilization—Insert dollar value or percent of work to the Managing Director <br /> Prime Firm <br /> TITLE: <br /> 6. *Signature of the Prime Consultant is required on each RS-2 Form to be <br /> submitted with the Letter of Interest(LOI)to be considered for selection <br /> 7. Complete"SPSF Status"section-Check the appropriate box regarding <br /> SPSF Status,check Yes if SPSF or No if not SPSF SPSF Status: ❑YES 0 NO <br />
The URL can be used to link to this page
Your browser does not support the video tag.