Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Short Range Transit Plan, RFLOI No 367-005394 I Letter of Interest <br /> Orange County,NC/Orange County Public Transit <br /> Proposed Project Schedule <br /> Based on our experience with similar projects, Nelson\Nygaard proposes a 14-month timeline for this project, <br /> though this schedule can be condensed or expanded as requested. Since one of the major destinations in Orange <br /> County is UNC Chapel Hill,we recommend a schedule that allows for public engagement to be conducted in the <br /> autumn and spring semesters, rather than the summer when there are fewer students and staff. <br /> 1 Project Management <br /> 1.1 Kickoff Meeting <br /> 1.2 Work Plan& Ongoing Management <br /> 1.3 Core Technical Team Meetings <br /> 2 Public Engagement <br /> 2.1 Public Involvement Plan <br /> 2.2 Project Website <br /> 2.3 Engagement Phase 1 <br /> 2.4 Engagement Phase 2 <br /> 3 Existing Conditions <br /> 3.1 Review of Past Plans and Projects � <br /> 3.2 Market Analysis �� <br /> 3.3 Existing Service Analysis 7-1 <br /> 3.4 State of the System 7-1 7-1 <br /> 4 Develop Strategies and Performance Matrix <br /> 4.1 Develop Performance Matrix <br /> 4.2 Develop Transit Strategies —1-1-1 <br /> 4.3 Evaluate and Prioritize Strategies <br /> 5 Implementation Strategy and Final Report <br /> 5.1 Implementation and Financial Plan <br /> 5.2 Draft and Final Plan <br /> 5.3 Final Presentations L_LLI L� 7—E <br /> Nelson\Nygaard Consulting Associates,Inc.122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.