Browse
Search
8.21.23 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2023
>
8.21.23 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 4:44:52 PM
Creation date
8/11/2023 4:38:13 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2023
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> 112 implementation, because of the urban areas of Orange County and Durham. This is a long-term process <br /> 113 to help address the safety concerns. <br /> 114 DOT does not want to put a light at the intersection, I would still like to encourage them to do an <br /> 115 evaluation of the area and a feasibility study to determine the possible location of where the light <br /> 116 should be placed during certain hours, and they could track the account. Orange County will submit a <br /> 117 spot safety request for the intersection, rely on their data and contact the sheriff office for additionally <br /> 118 data. <br /> 119 On Franklin Street project, where they created the bike lanes, there was a fatality where a guy ran into <br /> 120 an open door. So as part of the street design they put in vertical elastic. Would like to ask Chuck Edwards <br /> 121 that question, why couldn't DOT do that on the white stripe on the bridge that denotes the travel light <br /> 122 because the other side of that looks like there's 3 feet. It's low cost and it would help give drivers and <br /> 123 pedestrians a visual they don't currently have. Was Orange County the Franklin Street project a <br /> 124 highway project, called the road diet? During the normal resurfacing, we worked with DOT for a new <br /> 125 pavement marking. We worked with DOT to do a traffic analysis to show that the paint would move <br /> 126 narrower and cut down a couple of lanes. I think the vertical delineators. The white posts were paid for <br /> 127 and maintained by Chapel Hill. When they get knocked down, we put them back up. We've got a stock of <br /> 128 them in our warehouse for the project. Franklin street was a resurfacing. Yes, however we have had a <br /> 129 little bit of success with getting DOT to allow us to put in some of those vertical delineators, but it does <br /> 130 cost the local government, it's something that's worth exploring. Its not the most expensive thing in the <br /> 131 world, but you do have to buy them, and you do have to have folks who can put them in the ground, <br /> 132 which I think is where the county kind has a little bit of a leg behind the towns. The town has Public <br /> 133 Works department that is used to maintain and pave our streets in Chapel Hill and the county doesn't <br /> 134 have the history of maintaining streets. So, that's a skill that would have to be added or added to <br /> 135 existing towns. Orange County does not have funding mechanism for transportation. Could Orange <br /> 136 County and Chapel Hill work together and Orange County do contract with Chapel Hill? Or Could the <br /> 137 School Board get involved? Chapel Hill could ask and see. Could you provide the cost of Chapel Hills cost <br /> 138 of the delineators? Chapel Hill would provide Orange County follow up email regarding the cost. <br /> 139 <br /> 140 Another item from the DOT is called the ninth of vitamin, highway maintenance improvement program <br /> 141 in Hillsborough. The HMIP is a 4-year plan updated every year, it's the roads being resurfaced. DOT has <br /> 142 maintenance improvement list and anytime Orange Grove is on that list we will have contact DOT. <br /> 143 Orange County will work the resurfacing the bill and cost and see what other opportunities we can <br /> 144 provide and work with the team. <br /> 145 <br /> 146 Topics for new meeting: 1. Resident Nash Street wants to create an arboretum and they have drafted a <br /> 147 resolution. They would like to come to the August meeting and talk about the arboretum that connects <br /> 148 on the E trail and get local support improving the residential community. 2. Two studies, planning <br /> 149 projects the require online access that will run locally. <br /> 150 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.